BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a power facility in Rapid City, South Dakota. Completed plans call for the addition of a power facility; for the demolition of a power facility; and for site work for a power facility.

D/B-Vanderboom, Solar Addition. The Design-build Request for Proposals, Including the Performance Criteria for This Project, as Well as General Project Info, is Available by Contacting Steve Mezger, Ose Senior Engineer at Steve.mezger@state.sd.us 605-549-0121. Each Price Proposal in Excess of $100,000.00 Must Be Accompanied by a 10% Bid Bond Issued by a Surety Authorized to Do Business in the State of South Dakota and Made Payable to the Board of Regents of the State of South Dakota or Certified Check, Cashier's Check or Draft in the Amount of 5% of the Base Bid and All Add Alternates and Drawn on a State or National Bank or a. The Bor Reserves the Right to Reject Any or All Bids and to Waive Any Irregularities Therein. Qualitative and Management Shall Be Sealed in Separate Envelopes. Please Include 1 Copy of the Quantitative and Management Proposals for the Technical Review Committee. Be Aware Any Public Improvement Must Be Designed by a Licensed Architect/engineer, Licensed in South Dakota, Per Sdcl 5-18b-45.

GC Bidding

Solar Power Generation

$264,000.00

Public - State/Provincial

Addition, Demolition, Site Work

4

20

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
66
All Active Projects
24
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2024

March 27, 2025

img_map_placeholder

525 University Loop, Rapid City, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.