BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, asbestos abatement and new construction of a mixed-use development in Gary, Indiana. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

All work for the complete construction of the Project will be under one or more prime contracts with the Owner based on bids received and on combinations awarded. The Environmental Consultant (Alliance Environmental Group) will manage the construction of the Abatement Project. This project will be bid under one (1) category of work as follows: Abatement (asbestos, lead, and mold)\Demolition Environmental Abatement shall be in full accordance with the Bidding Documents which will be to prospective bidders at the time of the Pre-Bid Conference and Inspection or via electronic mail following the Pre-Bid Conference and Inspection. Bid security in the amount of five percent (5%) of the Bid, including all additive alternates, must accompany each bid in accordance with the Instructions to Bidders. The successful bidders will be required to furnish Performance and Payment Bonds for 100% of their contract amount prior to execution of Contracts. The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. All bids may be held for a period not to exceed sixty (60) days before awarding contracts. The Steel City Academy reserves the right to assign each contract awarded under these instructions, in whole or part, applying to only a portion of the Work, to Steel City Academy. Where a part of the work under any contract is assigned, all the work under that contract shall be administered jointly by the Owners as separate contracts in accordance with the Contract Documents.

Post-Bid

Educational

$12,000,000.00

Public - City

Asbestos Abatement, Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
69
Bidding Soon
1,748
All Active Projects
733
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2024

April 1, 2025

img_map_placeholder

1988 Polk St, Gary, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.