Site work for a water / sewer project in Boulder City, Nevada. Completed plans call for site work for a water / sewer project.

Construction Manager At Risk RFP - Ozone Equipment Upgrade River Mountains Water Treatment Facility Question Deadline 11/29/2024 Questions and Requests for Information All Questions or Requests for Information Related to This Rfp Must Be Directed Through online. Clarifications or Modifications to the Bid Documents Will Be Issued to All Bidders by Addendum to This Rfp. The Last Day to Submit Questions the Project This Project Consists of the Ozone Equipment Upgrade for the River Mountains Water Treatment Facility (Rmwtf), With the Owner Being the Southern Nevada Water Authority ("owner"). Cdm Was Selected by the Owner as the Design Engineer of Record ("engineer). Contractor Must Ensure Complete Compatibility With Daily Plant Operations and Associated Work Schedules. in Order to Participate, All Venders Must First Register as a Potential Bidder and Sign Nda With Mwh. An Award May Be Made to the Overall Best Value Responsive Bidder. The Award is Subject to the Final Approval of Owner and Engineer. Selection Will Be Made Based on the Following Criteria: 1. Price. Price for the Work as Set Forth in the Rfp Documents. 2. Adherence. Compliance With the Bidding Documents. 3. Schedule. Compliance With the Attached Construction Schedule. Until the Final Award of This Project, Mwh Reserves the Right to Reject Any or All Bids, Retract and, if Necessary, Re Advertise This Request for Proposal Without Explanation, Including Waiving Any Informalities Therein. the Work the Work Which is the Subject of This Rfp Consists of the Scope of Work More Fully Described in Exhibit C - Scope of Work Document Will Be Provided Through online With Attachments Listed Therein. Mwh Constructors (Mwhc) Was Selected as the Construction Manager at-risk (Cmar) for This Project. The Work of This Project Involves Improvements to the Ozone System, Including the Oxygen Generation System and Bromate Control Chemicals, at Both Facilities. The Existing Facility Will Be Maintained in Continuous Operation by the Owner at All Times During the Entire Construction Period, Except for Periods Specifically Delineated Within This Section. The Contractor Must Schedule and Conduct the Work Such That It Will Not Impede Any Part of the Treatment Process, Create Potential Hazards to Operating Equipment and/or Personnel, Reduce the Quality of the Plant Finished Water, Liquid Residuals Hauling Operations, Cause Treatment Process Upsets, or Cause Odor or Other Nuisance. It Shall Be the Contractor's Responsibility to Ensure Complete Compatibility With the Facility Operations in His Working Schedules and Sequenced Construction Activities. Contractor Must Ensure Complete Compatibility With Daily Plant Operations and Associated Work Schedules. in Order to Participate, All Venders Must First Register as a Potential Bidder and Sign Nda With Mwh. Nrs Submission Requirements This Project Will Follow Nrs338.1696 , Contract Between Construction Manager at Risk and Subcontractor to Provide Labor, Materials or Equipment on Project: Authority to Enter Into; Procedure for Awarding Subcontracts of Certain Estimated Value; Substitution of Subcontractor on Such Subcontracts; Availability of Certain Information to Applicants and Public. This Project is Being Funded Through the Clean Water State Revolving Fund Program (Srf). Mwh is Requesting Subcontractors and Supplier Quotes From All Qualified/certified Dbe Subcontractors and Suppliers. In Accordance With Executive Order 12549, Contractors, Subcontractors, and Material and Service Suppliers (Including Engineers) Whose Contract is Expected to Equal or Exceed $25,000 Must Have a Duns Number and Be Registered in the Us Government System for Award Management (Sam). SRF Requires the Implementation of the American Iron and Steel Act. Your Participation is Important to Us. If We Can Be of Help to You or Answer Any Question or Concerns You Might Have. The Project Will Also Follow Nrs338.01165 Requirements Relating to the Use of Apprentices on Public Works; Documents of Compliance; Annual Reports; Penalties; Apprenticeship Agreement; Regulations. the Nevada Labor Commissioner Has Prepared Forms for Use in Complying With the Apprenticeship Requirements. Apprenticeship Utilization Request Form Titled "request for Apprentice Availability on a Public Work" o Apprenticeship Utilization Waiver Request Form Titled: "apprenticeship Utilization Act Waiver Request" Apprenticeship Agreement Form Titled: "apprentice Agreement" *sample* Project Workforce Checklist Titled: "project Workforce Checklist" Additional Information Regarding This Bid Process, Procedure, or Specification May Be Obtained via Email Request at Brent.edwards@mwh Constructors.com. Pub: Nov. 4, 2024 Lv Review-journal *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$800,000.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
391
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

January 3, 2025

img_map_placeholder

243 Lakeshore Rd, Boulder City, NV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.