BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Site work for a mixed-use development in Boulder City, Nevada. Design plans call for site work for a swimming pool.

As of November 7, 2025, an engineer has been selected, and this project is in the design phase. Design is expected to completed between April 2026 and July 2026. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Engineering - Boulder City Swimming Pool Project Boulder City ("the City") is requesting Statements of Qualifications (SOQs) from interested and qualified firms for architectural and engineering design services for the Swimming Pool Project, B.C. Project No. 25-1235-MC. Design shall be based on the below scope of work and attached conceptual drawings included in this Request For Statements of Qualification (RFQ). The intended delivery method for construction is Construction Manager at Risk (CMAR). The firm selected will assist the City in the selection of a CMAR at the 30% design level. The City's budget for design and construction of the project is $34,000,000. The firm selected shall be required to design the facility to meet this budget. The method of Contractor Selection has not been Determined at this time. Question Deadline 01/30/2025 at 12:00 PM PT

Design

Swimming Pools

$34,000,000.00

Public - City

Site Work

16

19

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
4
Bidding Soon
425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

861 Avenue B, Boulder City, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.