Renovation of a municipal facility in Taft, California. Completed plans call for the renovation of a municipal facility.
**As of February 13, 2025, this project has not yet been awarded. A timeline for award has not yet been established.** Said bids shall conform to and be responsive to the Specifications and Contract Documents for the work as heretofore approved by the Agency. WORK DESCRIPTION: The work to be done consists in general of but is not limited to the engineering, fabrication, assembly/packaging, and shipping to the project site of a 100kW (minimum) output microgrid unit with 200kWh (minimum) usable battery energy storage system (BESS). Other items or details, not mentioned above, that are required by the Plans and Specifications, or these special provisions shall be performed, placed, constructed or installed All work must be completed as outlined in the Important Special Notice after the commencement date stated in the Notice to Proceed. Bidders are advised that, as required by federal law, the City of Taft is implementing a Disadvantaged Business Enterprise requirements (DBE). The DBE Contract goal for this project is 20 percent. This project is subject to the "Buy America" provisions of the Infrastructure Investment and Jobs Act (Nov. 2021) as modified by the Office of Management and Budgets final guidance published to the Federal Register (August 23, 2023). Upon written request for the electronic bid documents, Wallace Group will add the Supplier to the Registered Plan Holders List. 2022-0415 he work to be done consists in general of but is not limited to the engineering, fabrication, assembly/packaging, and shipping to the project site of a 100kW (minimum) output microgrid unit with 200kWh (minimum) usable battery energy storage system (BESS). Other items or details, not mentioned above, that are required by the Plans and Specifications, or these special provisions shall be performed, placed, constructed or installed All work must be completed as outlined in the Important Special Notice after the commencement date stated in the Notice to Proceed. The work to be done consists in general of but is not limited engineering, fabrication, assembly/packaging, and shipping to the project site of a 100kW (minimum) output microgrid unit with 200kWh (minimum) usable battery energy storage system (BESS). Other items or details, not mentioned above, that are required by the Plans and Specifications, or these special provisions shall be performed, placed, constructed or installed. (a) WORK TO BE DONE. The work to be done consists of furnishing all labor, materials, methods and processes, implements, tools and machinery, except as otherwise specified, which are necessary and required to construct and put in complete order for use in the proposed improvements designated in the Contract, and to leave the grounds in a neat condition. (b) ALTERATION. By mutual consent in writing of the parties signatory to the Contract, alterations or deviation, increases or decreases, additions or omissions, in the plans and specifications, may be made and the same shall in no way affect or make void the Contract. The City reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work as may be deemed necessary or expedient by the Engineer. (c) EXTRA WORK. New and unforeseen work will be classed as extra work when such work cannot be covered by any of the various items or combination of items for which there is a bid price. The Supplier shall do no extra work except upon written order from the Engineer. For such extra work the Supplier shall receive payment as previously agreed upon in writing, or he shall be paid on force account. Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry, in writing before 12 Noon (PST) on Friday, December 6, 2024. Any such inquiries or questions, submitted after bid opening will not be treated as a bid protest. Technical questions or requests for information (RFI's) should be emailed to Wallace Group, 612 Clarion Ct, San Luis Obispo, CA 93401 (Contact: Erik Rutherford, (805) 544-4011, erikr@wallacegroup.us). Responses to RFI, regardless of the source, will be emailed to all bidders.
Bid Results
Municipal
$429,363.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 24, 2025
March 11, 2025
550 Supply Row, Taft, CA
Related To This Project
Taft, CA
Bid Date: Jan 30 2025
Taft, CA
Bid Date: Mar 26 2025
Taft, CA
Bid Date: Mar 16 2025
Taft, CA
Bid Date: Apr 18 2025
Taft, CA
Bid Date: May 28 2025
Taft, CA
Bid Date: Jul 17 2025
Taft, CA
Bid Date: Jun 24 2025
Taft, CA
Bid Date: Jul 16 2025
Taft, CA
Bid Date: Sep 17 2024
Taft, CA
Bid Date: Sep 11 2024
Taft, CA
Bid Date: Jul 31 2024
Taft, CA
Bid Date: Feb 27 2024
Taft, CA
Bid Date: Oct 31 2023
Taft, CA
Bid Date: Dec 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.