BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Taft, California. Completed plans call for the renovation of a municipal facility.

Said bids shall conform to and be responsive to the Specifications and Contract Documents for the work as heretofore approved by the Agency. WORK DESCRIPTION: The work to be done consists in general of but is not limited to the engineering, fabrication, assembly/packaging, and shipping to the project site of a 100kW (minimum) output microgrid unit with 200kWh (minimum) usable battery energy storage system (BESS). Other items or details, not mentioned above, that are required by the Plans and Specifications, or these special provisions shall be performed, placed, constructed or installed All work must be completed as outlined in the Important Special Notice after the commencement date stated in the Notice to Proceed. Bidders are advised that, as required by federal law, the City of Taft is implementing a Disadvantaged Business Enterprise requirements (DBE). The DBE Contract goal for this project is 20 percent. This project is subject to the "Buy America" provisions of the Infrastructure Investment and Jobs Act (Nov. 2021) as modified by the Office of Management and Budgets final guidance published to the Federal Register (August 23, 2023). Upon written request for the electronic bid documents, Wallace Group will add the Supplier to the Registered Plan Holders List. 2022-0415 he work to be done consists in general of but is not limited to the engineering, fabrication, assembly/packaging, and shipping to the project site of a 100kW (minimum) output microgrid unit with 200kWh (minimum) usable battery energy storage system (BESS). Other items or details, not mentioned above, that are required by the Plans and Specifications, or these special provisions shall be performed, placed, constructed or installed All work must be completed as outlined in the Important Special Notice after the commencement date stated in the Notice to Proceed. The work to be done consists in general of but is not limited engineering, fabrication, assembly/packaging, and shipping to the project site of a 100kW (minimum) output microgrid unit with 200kWh (minimum) usable battery energy storage system (BESS). Other items or details, not mentioned above, that are required by the Plans and Specifications, or these special provisions shall be performed, placed, constructed or installed. (a) WORK TO BE DONE. The work to be done consists of furnishing all labor, materials, methods and processes, implements, tools and machinery, except as otherwise specified, which are necessary and required to construct and put in complete order for use in the proposed improvements designated in the Contract, and to leave the grounds in a neat condition. (b) ALTERATION. By mutual consent in writing of the parties signatory to the Contract, alterations or deviation, increases or decreases, additions or omissions, in the plans and specifications, may be made and the same shall in no way affect or make void the Contract. The City reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work as may be deemed necessary or expedient by the Engineer. (c) EXTRA WORK. New and unforeseen work will be classed as extra work when such work cannot be covered by any of the various items or combination of items for which there is a bid price. The Supplier shall do no extra work except upon written order from the Engineer. For such extra work the Supplier shall receive payment as previously agreed upon in writing, or he shall be paid on force account. Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry, in writing before 12 Noon (PST) on Friday, December 6, 2024. Any such inquiries or questions, submitted after bid opening will not be treated as a bid protest. Technical questions or requests for information (RFI's) should be emailed to Wallace Group, 612 Clarion Ct, San Luis Obispo, CA 93401 (Contact: Erik Rutherford, (805) 544-4011, erikr@wallacegroup.us). Responses to RFI, regardless of the source, will be emailed to all bidders.

Sub-Bidding

Municipal

$505,000.00

Public - City

Renovation

24

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
34
Bidding Soon
725
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2025

March 4, 2025

img_map_placeholder

550 Supply Row, Taft, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.