BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fall River, Massachusetts. Completed plans call for site work for a water / sewer project.

Project Replace approximately 785 LF of asbestos cement 12-inch sewer main with 18-inch PVC sewer main, and rehabilitate 4 sewer manholes Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Anyone receiving project information must be registered for public records purposes. Documents redistributed by a third party are not considered official Bidding Documents. All official Bidding Documents will be available once registered. City of Fall River, MA (Owner), in coordination with the Sewer Commission, invites Bidders to submit sealed Bids for IFB #25-18, North End Interceptor Sewer Improvements - Phase 1A, which includes: replacement of approximately 785 linear feet of asbestos cement 12-inch sewer main with 18-inch PVC sewer main, rehabilitation of 4 sewer manholes and all materials and equipment, construction, and services inherent to the Work. Estimated Project Cost: $1,200,000. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing by email as follows. Woodard & Curran, Inc. Dan Scott, Project Manager Email: DFScott@woodarcurran.com (and a copy to QWilkins@woodardcurran.com) Questions must be received by 12:00 p.m. local time on November 27, 2024 to be answered. The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents and as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features. 1. Rehabilitation of 4 sewer manholes, including rebuilding benches and inverts and installation of 32-inch watertight manhole frames and covers; 2. Open cut and replacement of approximately 785 linear feet of 12-inch sanitary sewer pipe with 18-inch PVC; 3. Installation of flow bypass and dewatering pumps; 4. Installation of temporary erosion and sedimentation controls 5. Access improvements, including tree clearing and grubbing, and site access; 6. Restoration of disturbed wetland areas; and 7. All materials, equipment, services and construction inherent to the Work.

Post-Bid

Water / Sewer

$1,200,000.00

Public - City

Site Work

78

24

43

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
168
Bidding Soon
2,628
All Active Projects
1,115
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

February 3, 2025

img_map_placeholder

Multiple Locations, Fall River, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.