Site work, new construction and renovation of a water / sewer project in Westford, Massachusetts. Completed plans call for the construction of a 9,072-square-foot water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
Project No: W5005-038-FV The Town of Westford, the Awarding Authority, is seeking sealed bids from experienced, qualified contractors for the construction of the Forge Village and Nutting Road PFAS Treatment Upgrades. The work consists of the following major items: 1. Construction of a new 3.02 MGD PFAS WTP housing PFAS filter vessels at the Forge Village WTP site located at 60 Forge Village Road. The new PFAS WTP building will be approximately 4,536 square feet constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA. 2.Construction of a new 3.37 MGD PFAS WTP housing PFAS filter vessels at the Nutting Road WTP site located at 19 Nutting Road. The new PFAS WTP building will be approximately 4,536 square feet constructed of masonry walls, wood roof trusses, an asphalt shing roof, vinyl siding, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA. 3. Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes at both sites. 4. Related work to integrate the new PFAS WTP buildings with the existing WTP facilities at both sites including but not limited to piping, masonry, chemical feed, electrical and SCADA, as well as all associated appurtenances at both sites. Add Alternate No. 1: Replacement in-kind of the existing finished water pumps at the existing Forge Village and Nutting WTPs as well as associated VFDs, reconnections, and appurtenances as required for a complete system inclusive of all testing. Add Alternate No. 2: Replacement in-kind of the existing backwash supply pumps at the existing Forge Village and Nutting Road WTPs as well as associated VFDs, reconnections, and appurtenances as required for a complete system inclusive of all testing. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to theconstruction contract. The goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/WBE participation by certified DBEs The project requires compliance with the Massachusetts Department of Environmental Protection Diesel Retrofit Program by use of after-engine emission controls that are EPA certified, or their equivalent, on all the off-road (non-registered) diesel vehicles/equipment used at the job site. The project is subject to the American Iron and Steel (AIS) requirement of Section 436 of Public Law (P.L.) 113-76, Consolidated Appropriations Act, 2014, which requires that all the iron and steel products used in the project are produced in the United States. Section 00800 contains further information on applicable iron and steel products and compliance. The project is subject to Build America, Buy America (BABA) requirements. Section 00800 containsfurther information on BABA compliance. Please be advised that there are 2 volumes of drawings. Volume 1 is for the Forge Village Treatment Plant & Volume 2 is for the Nutting Road Treatment Plant. Question Deadline 02/14/2025 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website for bidding document distribution at: http://www.tighebond.com/Projects_Out_to_Bid.php Addendum #1-#6 have been posted as of 2-18-2025. Please be advised there are 2 volumes of drawings. Volume 1 is for the Forge Village Treatment Plant and Volume 2 is for the Nutting Road Treatment Plant.
Bid Results
Water / Sewer
$19,783,000.00
Public - City
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
April 21, 2025
Multiple Locations, Westford, MA
Related To This Project
Westford, MA
Bid Date: Mar 28 2025
Westford, MA
Bid Date: Feb 04 2025
Westford, MA
Bid Date: Feb 07 2025
Westford, MA
Bid Date: Mar 11 2025
Westford, MA
Bid Date: Feb 20 2025
Westford, MA
Bid Date: Mar 18 2025
Westford, MA
Bid Date: Apr 04 2025
Westford, MA
Bid Date: Apr 04 2025
Westford, MA
Bid Date: Feb 11 2025
Westford, MA
--
Westford, MA
Bid Date: Nov 15 2024
Westford, MA
Bid Date: Oct 23 2024
Westford, MA
Bid Date: Sep 06 2024
Westford, MA
Bid Date: Aug 21 2024
Westford, MA
Bid Date: Aug 28 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.