BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2025 at 7:00 PM

Updated January 31, 2025

Site work and paving for a civil project in Jurupa Valley, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project Type Bid Response Types Line Items Type of Award Lump Sum License Requirements A Liquidated Damages 1,000 per day Estimated Bid Value 2,500,000.00 Project Duration 160 days Online Q&A Yes Q&A Deadline 11/18/2024 5:00 PM (PST) The work will take place on Holmes ave , Etiwanda ave and Felspar St. The project will The rehabilitation of AC pavement by primarily, but not limited to, the grind and overlay or removal and replacement of existing AC pavement on the streets and limits listedin the City of Jurupa Valley.pavement rehabilitation; striping and pavement markings, utility adjustments, traffic loop replacement, replace traffic signs, thermoplastic striping and pavement markings; traffic control and other related work as described in the Specifications and Contract Documents. Contractor's license "A" is required to bid with Bid bond of 10% of bid amount, construction duration is 160 working days and liquidated damages is $1000 per calendar days. Engineer's cost estimate of the project is $2,500,000.00. Contractor shall comply with the Prevailing wage requirement and SB 854.

Award

Roads / Highways

$2,500,000.00

Public - City

Paving, Site Work

5

9

2

3

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
594
Active Projects
275
Bidding Soon
3,326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

February 3, 2025

Project location map

Multiple Locations, Jurupa Valley, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.