BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

This is a service / maintenance or supply contract in Jurupa Valley, California. Contact the soliciting agency for additional information.

Question Deadline 02/20/2025 at 5:00 PM PT Online Q&A Yes The City of Jurupa Valley ("City") invites qualified and interested consultants to prepare and submit a proposal for construction management and inspection services For Construction Management and Inspection Services for various capital improvement project (Projects) . The city has identified four distinct projects and the consultant for each project will be selected based on the individual project proposal. It is important to note that a single consultant may be awarded one or more project depending upon the strength and competitiveness of their proposals. The purpose of this Request of Proposals (RFP) is to select the most-qualified Consultant to provide Construction Management, Construction Inspection, Geotechnical & Materials Testing Services for 2024-25 citywide pavement rehabilitation project. The projects involve removing and replacing existing AC Pavement, cold mill and asphalt overlay, asphalt pothole repairs, replacement of PCC sidewalk, curb and gutter, signal modifications, slurry seal, signage and striping and miscellaneous work as indicated on the construction plans, including other incidental and appurtenant work necessary for the proper completion of the projects. The projects are described below: 1. Market street pavement reconstruction and signal modification from Rubidoux Blvd. to Via Carro. Work includes new curb, signal modifications, full depth AC reconstruction, grind and overlay and signage and striping. The engineers' cost estimate for the project is $4.2 million. (19108) 2. Pacific Ave Phase 2 from Limonite Avenue to 42nd Street. (23115) Work includes, new curb, storm drain improvements, full depth AC reconstruction, grind and overlay, construction of sidewalk and ADA ramps, and signage and striping. The engineers' cost estimate for the project is 3. 2024/2025 Citywide Pavement Rehab Project. Pavement rehabilitation along various streets (TBD), map of the proposed streets is attached. Anticipated work includes 2" grind and overlay, construction of Handicap ramps and adjusting manholes and valves and signage and striping. Total anticipated construction cost $2.5 million. (24102)

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
668
Active Projects
265
Bidding Soon
3,273
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

Project location map

Multiple Locations, Jurupa Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.