Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Site work and paving for a civil project in Jurupa Valley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
As of April 29, 2025, the project awarded to All Cities Engineering, Inc., with the awarded amount of $5,919,335 The projects consist of furnishing, installing, testing and making operational approximately 4,990 L.F. of 8-inch and 4,130 L.F. of 12-inch diameter C-909 PVC waterline; installation of new water service and meter box; import materials; excavation, backfilling, compaction, paving, traffic control, make all connections to existing waterlines, abandonment of existing waterlines and associated appurtenances and all other work and materials to complete the contract work. Furnishing, installing, testing and making operational approximately installing 2,430 LF of 8-inch diameter SDR-35 PVC sewerline and removing approximately 2,430 L.F. of existing 8-inch diameter VCP sewerline removing and replacing existing sewer manholes, and rehabilitating existing sewer manholes; and all associated paving, trenching, and surface restoration import materials; excavation, backfilling, compaction, paving, traffic control and all other work and materials to complete the contract work. The successful Contractor shall furnish all labor, material, transportation, tools, supplies, plant, equipment, and appurtenances, unless specifically excepted, for the satisfactory completion of the entire contract work, in accordance with the Specifications and Drawings. The Engineer s Estimated Construction Cost is $6,135,000 . All work under this contract shall be completed and operational within 350 calendar days from the date District gives written "Notice of Award" to the Contractor. Please contact the project manager , Ashish Marwah , of Jurupa Community Services District at 951- 685-7434 ext. 147, or email jcsdbids@jcsd.us, for questions pertaining to the project. Questions from prospective bidders affecting interpretation or corrections related to the Plans and Specifications received after 5:00 p.m. on Tuesday, January 28, 2025 will not be answered.
Award
Water / Sewer
$6,500,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
April 7, 2025
44th St, Jurupa Valley, CA
Related To This Project
Jurupa Valley, CA
Bid Date: Mar 14 2025
Jurupa Valley, CA
Bid Date: Jan 19 2026
Jurupa Valley, CA
Bid Date: Feb 26 2025
Jurupa Valley, CA
--
Jurupa Valley, CA
Bid Date: Mar 06 2025
Jurupa Valley, CA
--
Jurupa Valley, CA
Bid Date: Apr 16 2025
Jurupa Valley, CA
--
Jurupa Valley, CA
--
Jurupa Valley, CA
Bid Date: Dec 03 2024
Jurupa Valley, CA
Bid Date: Nov 27 2024
Jurupa Valley, CA
Bid Date: Dec 03 2024
Jurupa Valley, CA
Bid Date: Dec 03 2024
Jurupa Valley, CA
Bid Date: Jun 17 2021
Jurupa Valley, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
