BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Renovation of a laboratory facility in Kirtland, New Mexico. Completed plans call for the renovation of a 34,000-square-foot laboratory facility.

Solicitation for: W912PP25R0004 Two-Phase Design/Build Repair Building 322 CEREBRO Laboratory, Kirtland Air Force Base, Bernalillo County, New Mexico Design/Build Repair Building 322 CEREBRO Laboratory, Kirtland Air Force Base, Bernalillo County, New Mexico The NAICS for this project is 236220, with a size standard of $45 Million. The acquisition process will consist of two phases. Phase One requires the submission of relevant qualifications. No more than five (5) of the most highly qualified offerors from Phase One will be selected to participate in Phase Two. The price proposal schedule will not be required until Phase Two. A pre-proposal conference and site visit will be conducted for Phase Two offerors. Offerors are advised that this requirement may be delayed, cancelled, or a revised at any time during the solicitation or final award process. As of August 12, 2025, Phase One is closed out; qualifications have been accepted and are being reviewed. A timeline for Phase Two is still to be determined by the US Army Corps of Engineers. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Laboratories

$10,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
20
Bidding Soon
176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

December 3, 2025

Project location map

To Be Determined, Kirtland, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.