BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated January 24, 2025

Site work and paving for a road / highway in Green River, Wyoming. Completed plans call for site work for a road / highway; and for paving for a road / highway.

** As of January 23, 2025, project was awarded to Kilgore Companies, LLC, awarded amount is $ 3 707 689. ** The project consists of the reconstruction of Segment 1 (PT1) of the 9-Mile Road Reconstruction project, including approximately 7,550 feet of paved roadway (CR#15) from near the Point of Rocks interchange, east ~1.5 miles up to and including the first cattle guard. The project will include removal of the full road section, earthwork grading, drainage, shoulder widening, approaches, culvert replacement, aggregate base leveling, hot plant mix pavement, cattle guards, fencing, signs, delineators, striping, rumble strips, and associated miscellaneous work necessary to complete the project in accordance with the Plans and Specifications by the Substantial Completion date of October 30, 2025. A Bid Additive item is also proposed, pending remaining funds, for 27,400 feet of chip seal with overshoot. All questions regarding the bidding documents or the work to be performed shall be submitted thru , or delivered to WHS in writing via email to kkreusel@whsmithpc.com by Monday, December 2nd, 2024 at 5:00 P.M. An addendum will be issued on December 3rd to address all questions. A certified check, cashier's check, or bid bond made payable to the Sweetwater County Clerk in an amount equal to ten percent (10%) of the bid shall accompany each bid as a guarantee that if the bond is accepted, the bidder shall execute a signed contract and furnish the Contractor's Bond within 10 working days after the Notice of Intent to award the contract. No bid may be withdrawn for a period of thirty (30) days after the date of the bid opening. All bids are to be prepared in accordance with the contract documents which were prepared by the Engineer, William H.

Award

Roads / Highways

$3,707,689.00

Public - County

Paving, Site Work

37

9

8

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

February 3, 2025

Project location map

9 Mile Road, Green River, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.