BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2025 at 7:00 PM

Updated September 11, 2025

Renovation of a water / sewer project in Ottawa, Ontario. Completed plans call for the renovation of a water / sewer project.

The ROPEC Screen and Degrit Building Rehabilitation will generally comprise of the following works: 1) Mechanical Screen Replacement i. Removal of existing screens and associated controls ii. Installation of six (6) mechanical screens iii. Modifications to the screen channels and grating to accommodate new screens. iv. Removal of skylights to permit removal and installation of screens v. Replacement and relocation of controls and instrumentation related to the screens, including local control panels, solenoid valves, level transmitters and field wiring. vi. Electrical wiring and miscellaneous works. 2) Installation of Washer Compactors 1. Installation of six screenings washer-compactors, including associated discharge piping ii. Controls and instrumentation related to the washer compactors, including local control panels, switches, solenoid valves and field wiring iii. Process piping modifications iv. Installation of diverter gates and associated control panels. v. Electrical wiring and miscellaneous works 3) Grit Classifier Modifications i. Relocation of existing grit classifiers and associated valves and piping ii. Installation of new grit screw conveyors and associated controls iii. Installation of discharge gates and associated control panels iv. Electrical wiring and miscellaneous works 4) Installation of New Belt Conveyors i. Installation of two (2) Belt Conveyors ii. Controls and instrumentation related to the belt conveyors, including local control panels, switches, instrumentation and field wiring iii. Structural metal frame support installation iv. Electrical wiring and miscellaneous works A letter from the Surety Company confirming the respondents total bonding limits. The successful bidder of the Stage 2 RFT will be required to provide a 50% Performance Bond and 50% Labour & Material Payment Bond on behalf of the respondent for all work. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. The anticipated period of contract(s) is from date of award to December 2027. Anticipated construction start: May 2025.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Renovation

9

6

8

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
106
Bidding Soon
1,388
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

May 1, 2025

Project location map

800 Green Creek Dr, Ottawa, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.