BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2024 at 7:00 PM

Updated December 31, 2024

Renovation of a power facility in Faribault, Minnesota. Completed plans call for the renovation of a power facility.

Site Address: 1101 Linden Ln City: Faribault County: Rice State/Province: MN Est. Value: $ 240,379.00 Est. Completion Date: July 31, 2025 Anyone attending will need to pre-register and submit background check information by November 22, 2024, at 3:00 PM CT. To pre-register contact the MCF-Faribault Management Analyst for registration: Jennifer Nohava, 507-33-0890, Jennifer.Nohava@state.mn.us. Responders must attend this pre-bid meeting prior to submitting their response. Responses received from responders that did not attend the pre-bid meeting will be rejected. This solicitation is Targeted Group (TG), Economically Disadvantaged (ED), or Veteran-Owned Small Businesses (TG/ED/VO) preference. A. The work will be done under one prime contract that includes: General, Mechanical, Structural, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Replace existing damaged 10.4 KW solar array with new 10.4 KW solar array. Contactor shall provide a pricing breakout for the solar array, associated equipment, and installation to the Owner. Breakout can be listed in Contractor's Schedule of Values report. 2.) Replace existing roof curbs with new roof curbs and support to structure below. New solar array will be installed on new roof curbs. 3.) Re-roof area impacted by new curb work. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor or as a subcontractor, the work for at least three (3) contracts which have achieved Substantial Completion since December 17, 2019 for construction of General Contracting that involved a similar project scope. Each of these contracts MUST have had a construction value of $120,000 or greater. Addendum #1 has been issued as of 12-12-2024.

Award

Solar Power Generation

$267,728.00

Public - State/Provincial

Renovation

16

12

8

9

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
122
Bidding Soon
1,508
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

Project location map

1101 Linden Ln, Faribault, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.