Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work and paving for a mixed-use development in Coupeville, Washington. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of October 23, 2025, a design firm has been selected. No timeline for construction has been established. *Previous solicitation listed below for reference:* Consultants will be considered for the following project: RHODODENDRON PARK ROAD TO PATMORE ROAD TRAIL PROJECT DESCRIPTION The work to be performed by the CONSULTANT consists of preparing preliminary engineering, PS&E for the design and construction of a 10-ft wide asphalt non-motorized multi-use trail in WSDOT right-of-way adjacent to SR-20 between Rhododendron Park Road and Patmore Road in the vicinity of the Town of Coupeville and Island County, WA. The general scope of work for the project includes 100 percent design and PS&E for a cost opinion to construct the trail and addressing the following major features/challenges: Design and engineering of a paved 10-foot-wide multi-use pedestrian, bicycle, and equestrian surface trail in a rural and urban setting Design drainage features Geotechnical and Storm-water analysis Coordination with property owners Determination of right of way needs, right of way plan preparation Environmental planning, preparation and securing all environmental and regulatory permit applications and completion of required environmental documentation Performance of tree survey following Chapter 2 of the WSDOT Roadside Policy Manual requirements Development of environmental mitigation strategies as necessary Performance of soils exploration and analysis Design retaining walls if any Traffic Control Plans for work in SR 20 Right-of-Way Familiarity with WSDOT Design Manual, Shared Use Paths, Chapters 1510 and 1515 Familiarity with Federal Highway Administration policies and standards for shared use trails Coordination with Utility purveyors regarding all utility related issues Public outreach and coordination working with WSDOT, local governments, property owners, and other stakeholders Estimate project cost and construction schedule All design work to meet/follow AGENCY standards, the WSDOT LAG Manual, the WSDOT Design Manual, WSDOT Construction Manual, WSDOT Environmental Manual, WSDOT Roadside Policy Manual, WSDOT Highway Runoff Manual, WSDOT Hydraulics Manual, WSDOT Roadside Integrated Vegetation Management Plans (IVM), WSDOT Maintenance Manual, and applicable State and Federal regulations. The method of Contractor Selection has not been Determined at this time.
Design
Roads / Highways
$490,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2026
State Rte 20, Coupeville, WA
Related To This Project
Coupeville, WA
Bid Date: Apr 08 2025
Coupeville, WA
Bid Date: Apr 22 2025
Coupeville, WA
Bid Date: Apr 22 2025
Coupeville, WA
Bid Date: Apr 08 2025
Coupeville, WA
--
Coupeville, WA
Bid Date: Sep 12 2025
Coupeville, WA
Bid Date: Aug 26 2025
Coupeville, WA
--
Coupeville, WA
Bid Date: Aug 14 2024
Coupeville, WA
Bid Date: Sep 09 2024
Coupeville, WA
Bid Date: Aug 06 2024
Coupeville, WA
Bid Date: Jul 23 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
