Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Renovation of a power facility in Sunnyside, Washington. Completed plans call for the renovation of a power facility.
Building 26 Elevators Modernization at Columbia Generation Station - Energy Northwest, a joint operating agency and municipal corporation in the State of Washington, invites Bids for the potable water system installation at Columbia Generating Station (Columbia) For questions related to the examination of Site, or for directions, contact Robert Mendez by calling 509.372.5380 or email at rdmendez@energy-northwest.com. Questions due by December 3, 2024, no later than 1300 (Local time, Richland Washington). A. The scope of work listed in A.2 is intended to give an overview of the Work and is not inclusive of all the Work necessary to complete the project. For the complete scope of work see Attachment 1 (Attached as a separate document). B. The Site location 74 North Power Plant Loop, Richland, WA 99354, a nuclear power generating facility. The Work shall be performed outside the Protected Area. C. Contractor shall always maintain one working elevator during the Work. D. Contractor shall provide all the required equipment and tooling necessary to complete the Work, the Work includes, but is not limited to the following: 1. Provide and install all materials specified for the modernization of the elevator. 2. Arrange and pay for all inspections and permits. 3. Provide new door operation and protection. 4. Provide new power unit and controllers. 5. Provide new wiring. 6. Provide new cab finishes. 7. Provide new voice annunciation unit and special emergency service. 8. Provide standard maintenance as described in the specifications. 9. Modify power feeders. 10. Minimize noise and vibration from construction work. 11. Provide as-built documentation to the Technical Representative or designee.
Post-Bid
Power Plant
$720,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 31, 2024
January 30, 2025
74 N Power Plant Loop, Sunnyside, WA
Related To This Project
Sunnyside, WA
Bid Date: Dec 05 2024
Sunnyside, WA
Bid Date: Dec 05 2024
Sunnyside, WA
Bid Date: Dec 13 2024
Sunnyside, WA
Bid Date: Jan 23 2025
Sunnyside, WA
--
Sunnyside, WA
Bid Date: Dec 31 2024
Sunnyside, WA
Bid Date: Mar 27 2025
Sunnyside, WA
Bid Date: Apr 09 2025
Sunnyside, WA
Bid Date: Nov 06 2024
Sunnyside, WA
Bid Date: Sep 09 2024
Sunnyside, WA
--
Sunnyside, WA
Bid Date: Jul 19 2024
Sunnyside, WA
Bid Date: Jul 26 2024
Sunnyside, WA
Bid Date: Jul 15 2024
Sunnyside, WA
Bid Date: May 30 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
