Site work for a mixed-use development in Arvin, California. Completed plans call for site work for a educational facility; and water / sewer project.

Arvin High School: 5-Year Portables Electrical 1. These portables will be a phased construction schedule. B14-20 will be first. Then B8-13, then B1-B7. The sequencing and timing of the project will determine how B21 to B35 are completed. Refer to the construction schedule for timelines that must be met by each prime contractor or be subject to liquidated damages. The contractor shall account for any overtime or crew size increases to maintain the schedule. Contractor shall also assume they may be required to work on more than one phase at a time. 2. The District will have all portables on temporary power, communications, and fire alarm prior to the project starting. This contract shall still remove all existing data cabling in the portables and turnover to the District all audio visual, IDF and fire alarm components. 3. Coordinate with the district and its communications, fire alarm, and power teams for shutdown and start-up of each system. Contractor shall account for, in their scheduling, to accommodate the district to perform their scopes of work within the summertime schedule. This also includes the removal of desks, installation of desks, and removal and installation of the portables. All scopes of work for occupancy must be complete during the summer schedule. 4. Contractor shall hire a ground penetrating radar company as well as other means necessary to survey all trench locations to ensure all utilities are found and location and depth are verified. This shall occur prior to any work so that revised routing can be coordinated. The contractor shall provide all conflicts to the design team prior to work commencing so a complete and coordinated design is achieved. The contractor needs to ensure all existing and new underground work does not conflict with new utilities. The is an existing high voltage solar conduit and cabling. Contractor shall identify it and its depth and layout all crossings to ensure its protection.5. New trenching, conduit, boxes, backfill, grounding system and wiring as per the contract documents. Contractor will encounter existing underground utilities from previous portables. Contractor to assume to be working on conduits behind portables as concrete contractor is working on rebar and formwork for foundations to help expedite the schedule. 6. Provide and install fire alarm complete per the contract documents. Prior to procurement of any materials, setup a coordination with District and its Fire Alarm system supervisor for a pre-construction meeting. 7. Provide and install data/communications complete per the contract documents including wiring within the portable, IDF, and terminations. All wiring shall be within walls or ceilings. Prior to procurement of any materials, setup a coordination with District and its Data/Communications system supervisor for a pre-construction meeting. 8. Contractor furnished, and contractor installed projector mount. Pursuant to Public Contract Code section 20111.6, prequalification of the prime contractor (bidder), and of its mechanical, electrical, and plumbing ("MEP") subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46), is required for the bidder to submit a bid on this project. Prospective bidders and their MEP subcontractors (1) are required to submit to the Owner a completed prequalification questionnaire and financial statement, on forms provided by the Owner, no later than ten business days prior to the date fixed for the public opening of sealed bids, and (2) must be announced as prequalified no later than five business days prior to the date fixed for the public opening of sealed bids. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date January 6, 2025 Project Duration 180 Calendar Days Liquidated Damages $3,500.00 per calendar day License Requirements C10

Sub-Bidding

Educational

$600,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
21
Bidding Soon
544
All Active Projects
240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

January 6, 2025

img_map_placeholder

900 Varsity Rd, Arvin, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.