Renovation of a theater / auditorium in Norfolk, Virginia. Completed plans call for the renovation of a theater / auditorium.

W. M. Jordan Company is soliciting proposals from qualified firms for preconstruction services required in connection with the design and renovation of Chrysler Hall in Norfolk, Virginia. This solicitation will include both mechanical and electrical subcontractors/trade partners. The successful companies for each trade will be expected to function as part of the project delivery team during the preconstruction and construction process and provide a variety of document reviews and costing services necessary to support the design and construction effort. This solicitation will be completed in 2 Steps: RFQ and RFP. Step 1 the RFQ- "Request for Qualifications" and Step 2 the RFP- "Request for Proposals". The RFQ submissions will be reviewed by the Project Delivery Team and paired down to a "short list" of trade partners that will be invited to step 2, the RFP. Proposers must compete the full RFQ package to be considered to proceed to Step 2 - RFP. Project Value: $85 Million Project Size: 133,965 SF The Chrysler Hall Renovation project aims to modernize the largest theatre in the Norfolk region, enhancing its role as a premier performing arts venue. The renovation will cover a total area of 133,965 square feet, distributed across four above-ground stories and two below-ground levels. Basement: 25,100 sf Substage: 25,859 sf Lobby & Orch.: 38,883 sf Dress Circle: 20,969 sf Balcony: 21,737 sf Projection: 1,417 sf Total: 133,965 sf Key improvements include expanding and modernizing lobby spaces, upgrading restrooms, enhancing accessibility with new ramps and elevators, and improving the patron experience with better seating arrangements and concessions. The project also involves significant updates to the stage area, including new flooring, a code-compliant fire curtain, and additional restrooms and dressing rooms. Overall, the renovation seeks to create a more connected, comfortable, and efficient space for both performers and audiences. The project will also involve modernization of the central plan. The existing scope complex is conditioned from a central utility plant located on the basement level adjacent to Chrysler Hall. The central plant serves Chrysler Hall, the Scope Arena and the Scope Exhibition Hall. MEP design narratives are provided. Additional preliminary SD Design for Chrysler Hall are included for reference. Anticipated valuation Mechanical - $20 Million - $25 Million Electrical - $12 Million - $15 Million May 9th, 2025: Approval -Short List from RFQ May 9th, 2025: Issue RFP Middle of May 2025: Site Visits Middle of June 2025: Trade Partner Interviews End of June 2025:Trade Partner Selection October 14, 2025: Issue Construction Documents TBD Pre-order Long Lead Material (as needed) November 3, 2025, Final Price - Confirmation - Issue Subcontracts Dec - Jun 2026 Pre Planning- Coordination June 1, 2026, Mobilize September 5, 2027, Substantial Completion Post-Proposal interviews with invited firms will be held following receipt and review of the proposals by the Project Delivery Team. The personnel expected to attend the interview will be your firm's proposed Project Executive, Preconstruction Manager, Project Manager, Project Estimator and Superintendent. These or other individuals attending this Post-Proposal interview must have the authority to represent your company and to make decisions and/or commitments on behalf of the company. The interviews will be held at the W. M. Jordan office in Newport News VA. W. M. Jordan Company and the City of Norfolk believe the success of the project can be enhanced greatly by having the major subcontracted trades involved earlier during the Design and Preconstruction process. The goal is to select a mechanical (HVAC & Plumbing), and electrical subcontractor to perform in the design assist role. W. M. Jordans Company, preference is to continue working with the design assist subcontractors during construction if an agreed upon lump sum construction cost can be negotiated. However, at the discretion of W. M. Jordan and the City of Norfolk construction may be competitively bid. Address all questions via email to Paul Bollinger.

Post-Bid

Theaters / Auditoriums

$85,000,000.00

Public - City

Renovation

664

26

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Project Record Documents, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Membrane Roofing, Thermoplastic Membrane Roofing, Ethylene-Interpolymer Roofing, Polyvinyl-Chloride Roofing, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Wheelchair Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
52
Bidding Soon
758
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

June 1, 2026

img_map_placeholder

215 St Pauls Blvd, Norfolk, VA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ D/B - Chrysler Hall Design Assist Narrative

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.