BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2025 at 7:00 PM

Updated January 14, 2025

Site work for a water / sewer project in Okeechobee, Florida. Completed plans call for site work for a water / sewer project.

Installation of approximately 8,100 LF of various diameter sanitary force main along with appurtenances. The project consists of furnishing labor, equipment, and materialsfor the construction of a wastewater Force Main (as described in the Drawings and Specifications). The work generally includes, but is not limited to, installation of 4", 6", 10" and 12" HDPE force main piping (owner provided), including fittings, valves and other appurtenances; ductile iron force main installation (aerial crossing); and horizontal directional drill installation. The project includes road and driveway crossings, and related restoration. Any questions pertaining to the project specifications or scope of work will be addressed to ENGINEER, in writing to the physical or email address noted below, no later than April 20, 2021: Questionsshall be submitted in writing to: Jeffrey M. Sumner, P.E. Sumner Engineering & Consulting, Inc. 410 NW 2nd Street Okeechobee, FL 34972 (863) 763-9474 Email: jeff@sumnerengineering.com The Contractor shall furnish all labor, superintendence, materials, power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion of the Work. The Contractor shall obtain and pay for all necessary local building permits. The Contractor shall perform and complete the Work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer and in strict accordance with the Contract Documents. The Contractor shall clean up the Work and maintain it during and after construction, until accepted, and shall do all Work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the Work. 2. The cost of incidental work described in these Project Requirements for which there are no specific Contract Items shall be considered as part of the general cost of doing the Work and shall be included in the prices for the various Contract Items. No additional payment will be made therefore. 3. The Contractor shall provide and maintain such modern, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the Work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials, and equipment, prior approval of the Engineer notwithstanding

Award

Water / Sewer

$658,650.00

Public - City

Site Work

28

12

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
128
Bidding Soon
1,815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

January 10, 2025

Project location map

100 SW 5th Ave, Okeechobee, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.