Published January 10, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Redwood City, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work of this project consists generally of: without limitation, asphalt concrete grinding, area repairs, and overlay; asphalt concrete speed cushions; utility cover adjustments; traffic signage and striping; temporary traffic control; stormwater pollution protection. Work shall be completed within 90 Calendar Days from the date when Contract Time commences to run. Asphalt concrete grinding, area repairs, and overlay; asphalt concrete speed cushions; utility cover adjustments; traffic signage and striping; temporary traffic control; stormwater pollution protection. Work shall be completed within 90 Calendar Days from the date when Contract Time commences to run. The Engineer's Opinion of Probable Costs is approximately $1,650,000. 1 To the greatest extent permitted by law including, without limitation, Civil Code Section 2782, Contractor hereby releases, and shall defend, indemnify, and hold harmless City, and its officers, employees, consultants, representatives, and agents, and all other parties having any other interest in the Site, against any claim or liability, including attorney's fees, arising from or relating to any Site-related access, investigation, test, inspection and/or other activity conducted by Contractor or any of Contractor's officers, employees, consultants, representatives, and/or agents, except such loss or damage caused by the active negligence or willful misconduct of the City. 1 REDWOOD AVE EL CAMINO REAL HUDSON ST 2 REDWOOD AVE HUDSON ST VALOTA RD Before you may start any Work at the Site, you must attend a pre-construction conference. The pre-construction conference may be arranged through Sayed Zahori, Project Manager, szahori@redwoodcity.org, (650) 780-7321. Questions regarding bonds and insurance may be directed to Sayed Zahori, Project Manager, at the same number. Question Deadline 11/27/2024 Bidders must direct all questions about the meaning or intent of Bidding Documents to City in writing. Interpretations or clarifications considered necessary by City in response to such questions will be issued by written Addenda mailed, faxed, or delivered to all parties recorded by City as having received Bidding Documents. City may not answer questions received less than 7 Calendar Days prior to the date for opening Bids.

Award

Roads / Highways

$1,094,885.00

Public - City

Paving, Site Work

13

11

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Decorative Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
99
Bidding Soon
1,616
All Active Projects
733
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

January 3, 2025

img_map_placeholder

Redwood Ave, Redwood City, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Pavement Overlay Project (Redwood Avenue)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.