BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2024 at 7:00 PM

Updated August 29, 2025

Site work for a bridge / tunnel in Warrenton, Oregon. Completed plans call for site work for a bridge / tunnel.

This Work consists of preparing and coating new steel on Bridge No. 01400, span 2. Hot dip galvanize all new steel before applying coating system. Questions and Answers - 11/18/1024 Replace the center span of the Skipanon River Bridge in Warrenton for the benefit of ODOT. Earliest Start Date: 6/16/2025 Substantial Completion: 8/29/2025 Final Completion: 9/12/2025 bid open notes : Microsoft Teams Need help Join the meeting now Meeting ID: 243 332 720 000 Passcode: BpdQQX Dial in by phone +1 971-277-1965,,924129581# United States, Portland Find a local number Phone conference ID: 924 129 581# For organizers: Meeting options | Reset dial-in PIN

Award

Bridges / Tunnels

$463,402.00

Public - State/Provincial

Site Work

21

7

40

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
48
Bidding Soon
1,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

June 16, 2025

Project location map

To Be Determined, Warrenton, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.