Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Site work for a water / sewer project in Warrenton, Oregon. Completed plans call for site work for a water / sewer project.
The Following is a Summary of the Major Elements of Work That Are to Be Provided by the Contractor. 1. Installation of Approximately 4,500 Linear Feet of Buried 18- inch Diameter Pvc C900 Dr 18 Water Transmission Pipe, Isolation Valves and Other Water System Appurtenances, and Connections to Existing Watermains and Services. The Water Transmission Main Will Be Installed Along Ft Stevens Highway (or-104) and Nw 13th Street. Project Substantial Completion Shall Be 120 Calendar Days From Notice to Proceed and Project Final Completion Shall Be 150 Calendar Days From Notice to Proceed. Any Bids Received After the Above Specified Time Will Not Be Considered. The Carrier, Including the United States Postal Service, is Considered an Agent of the Bidder. All Bids Must Be Accompanied by a Certified Check, a Cashier's Check, or Bid Bond in an Amount Equal to at Least 5% of the Total Bid. If the Total Bid Exceeds $50,000.00 the Contract Will Be Subject to Prevailing Wage Statute Ors 279c.800 to 279c.870. The Contract is Subject to Federal Prevailing Wage Rates Under the Davis-bacon Act (40 U.s.c. 3141 Et Seq). Prior to Submission of Its Bid, Bidder Shall Be Registered With the Oregon Construction Contractor's Board as Required by Ors 701.055, and Thereafter Comply With the Requirements of Ors 701.035 to 701.055. Bidders Shall Be Qualified in Accordance With the Applicable Parts of Ors 279c in Order to Submit a Bid for Public Works in Oregon. Work Under This Contract is Funded by the Federal Safe Drinking Water Revolving Loan Fund Through Business Oregon, a Grant From the Environmental Protection Agency, and a Partnership of Local and/or Private Funds. This Contract is Subject to Federal Statutory Requirements of American Iron and Steel (Ais) and Build America Buy America (Baba) Act. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$2,293,718.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
July 28, 2025
225 S Main Ave, Warrenton, OR
Related To This Project
Warrenton, OR
--
Warrenton, OR
Bid Date: Jul 10 2025
Warrenton, OR
Bid Date: Jul 01 2025
Warrenton, OR
Bid Date: Jul 21 2025
Warrenton, OR
Bid Date: Aug 01 2025
Warrenton, OR
Bid Date: Aug 26 2025
Warrenton, OR
Bid Date: Aug 22 2025
Warrenton, OR
Bid Date: Sep 17 2025
Warrenton, OR
--
Warrenton, OR
Bid Date: Apr 24 2025
Warrenton, OR
Bid Date: Mar 21 2025
Warrenton, OR
Bid Date: Feb 20 2025
Warrenton, OR
Bid Date: Dec 03 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
