EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 4, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in La Crosse, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Losey Boulevard, from north of Mormon Coulee Road, to south of Ward Avenue, to undergo a, "Road Diet." This will convert the roadway from 4 to 3 lanes. This corridor of Losey Boulevard is a narrower public Right-of-Way, with substandard boulevards/terraces and sidewalks. The traffic volumes do not warrant 4 lanes of thru traffic. Therefore, a 3-lane section will be implemented, with one lane each of northbound and southbound travel, and one center turn lane for left turns into and out of driveways and sideroads. The reallocated width will allow for wider sidewalks and bouelvards that will support the planting of trees throughout the corridor. Work includes complete replacement of all three utilities (Storm, Water, and Sewer). This project is funded up to a 90% maximum by Highway Safety Improvement Program (HSIP) funding, not including Sewer and Water. Project to be let by WisDOT. As of February 4, 2025, this project is included in the City of La Crosse's Fiscal Year 2025-2029 CIP. Funding for construction is allotted for FY 2027. Further information regarding a design firm or detailed timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,065,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
30
Bidding Soon
343
All Active Projects
187
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

img_map_placeholder

Losey Blvd S, La Crosse, WI

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Losey Boulevard, Mormon Coulee Road to Ward Avenue - 3 - Lane Conversion - 982 - City of La Crosse

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.