BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2024 at 7:00 PM

Updated December 18, 2024

Site work, paving and outdoor lighting for a mixed-use development in Holton, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a road / highway.

0.19 mi of hot mix asphalt cold milling and resurfacing, concrete sidewalk ramps, lighting and pavement markings on Holton Duck Lake Road from Cedar Creek to Hoppman Road and Duck Lake Road from M-120 to North of Hoppman Road, Muskegon County. This is a Local Agency project. Net classification required for this project is Comb/Jt. 843 Cb, Ea or Comb/Jt. 843 Cb, J or Comb/Jt. 843 Ea, J In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea, J and L. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec NRT 61000 STUL 61000 Job No 220212A 220697A Federal No 24A0987 24A0802 MIDOT - 2412 064 - Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Sidewalk Ramps, Lighting and Pavement Markings on Holton Duck Lake Road Question Deadline 11/29/2024

Award

Roads / Highways

$794,682.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

20

9

6

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

March 31, 2025

Project location map

Holton-Duck Lake Rd, Holton, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.