Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
Site work for a water / sewer project in Dixon, Illinois. Completed plans call for site work for a water / sewer project.
**As of February 4, 2025, project was awarded to Martin and Company, awarded amount is $62,391.05.** Drainage Improvements Site Directions: 713 N. Galena Avenue, Behind Napa Auto Parts Building. Description: 2024 City of Dixon Drainage Improvements Project on N. Galena Avenue (behind Napa Auto Parts). 6' Manholes, 24" Storm Sewers, Trench Backfill, Rip Rap, & other construction items. General: This project consists of the drainage improvements behind the Napa Auto Parts Store address 713 N. Galena Avenue, located in the City of Dixon, Illinois. The City reserves the right to add or subtract areas and/or their appurtenances within the limits of the Standard Specifications. Costs of any necessary saw cutting as directed by the Engineer shall also be incidental to the pay item for which saw cuts are necessary. No additional compensation will be given and they should be considered incidental to their respected pay items. The Contractor shall coordinate with City officials, Napa Auto Parts and the Engineer on scheduling work that minimizes disruptions with the Napa Auto Parts business. Failure to coordinate work with the City and Napa management, the Contractor will be assessed damages at $1,000 per day. This will help minimize the impact on affected customers and employees of the Napa Auto Parts store. All Trenches shall be filled with compacted Aggregate immediately upon installation of storm sewers, and manholes. The contractor shall maintain these aggregate trenches until the completion of the project. Concrete Collars shall be considered incidental to the Contract. No additional compensation will be made for them. All bidders shall be pre-qualified and in good standing with the Illinois Department of Transportation prior to the bid opening in order to submit a bid proposal. Any bidders found not in compliance on the day of the bid opening with IDOT shall be disqualified from the bidding process.
Award
Water / Sewer
$62,391.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2024
January 13, 2025
713 N Galena Ave, Dixon, IL
Related To This Project
Dixon, IL
--
Dixon, IL
--
Dixon, IL
Bid Date: Oct 14 2020
Dixon, IL
Bid Date: Jan 16 2025
Dixon, IL
Bid Date: Jan 21 2025
Dixon, IL
Bid Date: Feb 10 2025
Dixon, IL
Bid Date: Mar 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
