BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Galesburg, North Dakota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.

Proposed Work Consists of 0.1040 Miles of Structure Replacement, Grading, Salvaged Base Course, Hma Located Cmc 4928, 2 Miles East of Galesburg And Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Removal of Structure; 1394 Sy Removal of Bituminous Surfacing; 951 Cy Common Excavationtype a; 629 Cy Topsoil; 1 Ea Box Culvert Excavation; 1546 Cy Foundation Fill; 1 Ea Foundation Preparation-box Culvert; 47 M Gal Water; 5.5 Sta Subgrade Preparation-type a-12in; .78 Acre Seeding Class Ii; .78 Acre Temporary Cover Crop; 1.56 Acre Straw Mulch; 148 Cy Riprap Grade Ii; 50 Lf Silt Fence Supported; 50 Lf Remove Silt Fence Supported; 332 Lf Fiber Rolls 12in; 200 Lf Remove Fiber Rolls 12in; 50 Lf Flotation Silt Curtain; 50 Lf Remove Flotation Silt Curtain; 790 Ton Salvaged Base Course; 442 Ton Commercial Grade Hot Mix Asphalt; 52 Lf 12ft X 11ft Precast Rcb Culvert; 52 Lf Dbl 12ft X 11ft Precast Rcb Culvert; 2 Ea 12ft X 11ft Precast Rcb End Section; 2 Ea Dbl 12ft X 11ft Precast Rcb End Section; 1 L Sum Mobilization; 1267 Unit Traffic Control Signs; 10 Ea Type Iii Barricade; 2557 Sy Geosynthetic Material Type G; 222 Sy Geosynthetic Material Type Rr; 4 Ea Object Markers - Type Iii; 2013 Lf Pvmt Mk Painted 4in Line; 1 Ea Temporary Stream Diversion; .143 Acre Wetland Mitigation Site 1. Bid Range - $1,000,001 to $1,500,000 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. A bid guarantee is required by Section 24-02-20, NDCC. The bid guarantee may be a bid bond equal to 10 percent of the full amount of the bid or a cashier's check of the bidder on a solvent bank equal to 5 percent of the bid. Bid bond shall be on the department form SFN 14196. Prior arrangements may be made with the department to file bid guarantees in advance. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. NDDOT - 23976 - Structure Replacement, Grading, Salvaged Base Course, HMA *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$1,500,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

55

6

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
113
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2024

February 11, 2025

img_map_placeholder

CMC 4928, Galesburg, ND

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.