BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a detention facility in Hollister, California. Completed plans call for the renovation of a detention facility.

Old Jail Roof Mounted Air Handling Unit (AHU-1) SCOPE OF WORK The scope of work includes but is not limited to the following. Remove the existing swamp cooler unit and curbing. Clean all existing ducting supply and return lines. Furnish and install new thermostats and controls per the plans and specifications and the approved submittal by Engineer of Record (EOR) or the county's Project Manager (PM). (TAB) Testing, Adjusting, and balancing the new system. Furnish and install the new rooftop unit and curb per the plans and specifications and the approved submittal by EOR or the county's PM. Wire new rooftop unit as required by the manufacturer. Crane Services and FAA Permit Attend coordination meetings as required. Coordinate Inspections per the Permit card and schedule through online Provide Pre and Post Construction and Demolition (C&D) Report Provide Closeout Documents, including start-up and operations manuals, testing reports, redlines, and Warranty. Questions Must Be Submitted Electronically at online. The County of San Benito is located in the Central Coast Region, 95 miles south of San Francisco. Adjacent counties include Santa Clara, Santa Cruz, Monterey, Fresno and Merced. Land area is 1396 square miles. Terrain varies from flat valley floor to hilly rangeland in the east, to 5,450 foot peaks far south. The City of Hollister where the County seat is located is at an elevation of 229 feet. The north and northwest segments of the County are comprised of urban areas, leaving the southern portion of the County primarily rural. Major transportation routes bisecting the County include Highways 101, 129, 156 and 25. The current population of San Benito County is approximately 68,000 inclusively. The County has two incorporated cities - Hollister, population 43,000, and San Juan Bautista, population 2,200. The San Benito County Resource Management Agency is requesting proposals to replace the existing Roof Mounted Air Handling Unit (AHU-1) at the old County Jail. This is a plan and specs project, and it is necessary to adhere to the standard process. It's important to note that this is a publicly funded project, so it must comply with prevailing wage regulations.

Sub-Bidding

Jails / Prisons

$500,000.00

Public - County

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
48
Bidding Soon
1,191
All Active Projects
503
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

January 17, 2025

img_map_placeholder

710 Flynn Rd, Hollister, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.