BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2025 at 7:00 PM

Updated January 17, 2025

Renovation of a mixed-use development in Dekalb, Illinois. Completed plans call for the renovation of a educational facility.

** As of 12/23/2024 this project has not yet been awarded. A timeline for the award has not yet been established.** Mechanical Replacement Project at Various Schools Bids Shall Be Submitted in Duplicate on Forms Issued by Architect. Bid Security: Bids Shall Be Accompanied by a Bid Security of at Least 10% of the Total Amount of the Base Bid and All Additive Alternate Bids. This May Be in the Form of a Certified Check, Cashier's Check, Bank Draft or Bid Bond, Payable to the Owner as a Guarantee That Should the Bidder Be Awarded the Work, the Bidder Will Enter Into a Contract With the Owner and Will Furnish the Proper Performance and Payment Bond Within the Time Limit Set by the Owner. Bid Securities Will Be Returned to All Other Bidders When the Successful Bidder Files a Proper Performance and Payment Bond and the Contract is Executed by the Owner. If the Successful Bidder Fails to File Such Contract and Performance and Payment Bond, the Amount of His Bid Security Shall Be Forfeited to the Owner as Liquidated Damages. Wage Rules: Each Craft, Type of Worker and Mechanic Needed to Execute the Contract Shall Be Paid the Prevailing Wage Rate for the Locality in Which the Work is Performed, in Accordance With All Federal Laws and Laws of the State as Well as Local Ordinances and Regulations Applicable to the Work Hereunder and Having Force of Law. Performance Bond: a Performance and Payment Bond for the Full Amount of the Contract Will Be Required of the Successful Bidder. All Costs Associated With the Bond Shall Be Included in the Bid Amount. Rights Reserved by Owner: the Owner Reserves the Right to Waive Any Irregularities and/or Reject Any or All Bids When, in the Opinion of the Owner, Such Action Will Serve the Best Interests of the Owner. The project will be bid out to Contractors under one contract. Base Bid - Boiler replacement at Brooks Elementary School Alternate Bid #1 - Boiler replacement at Founders Elementary School Alternate Bid #2 - Water equipment installation at various schools. Alternate Bid #3 - Install ceiling fans in the main gym at Founders Elementary School. Alternate Bid #4 - Install ceiling fans in the small gym at Founders Elementary School. Alternate Bid #5 - Install ceiling fans in the gym at Brooks Elementary School. Alternate Bid #6 - Install ceiling fans in the gym at Tyler Elementary School. Alternate Bid #7 - Replace ductwork in the gym at Jefferson Elementary School. Alternate Bid #8 - Install boiler flue piping at Littlejohn Elementary School.

Award

Educational

$1,365,000.00

Public - City

Renovation

56

9

7

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
470
Active Projects
248
Bidding Soon
3,431
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

June 3, 2025

Project location map

Multiple Locations, Dekalb, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.