Published March 18, 2025 at 8:00 PM

Updated September 16, 2025

Site work and paving for a mixed-use development in Modesto, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of March 18, 2025, this project has not yet been awarded. The project is expected to be awarded on April 2025. A. The Contractor shall furnish all labor, materials and equipment necessary to complete the work as shown in the Contract Documents. All incidental work not shown in the Contract Documents which is necessary to complete the work necessary to provide the system described, or shown, shall be furnished and installed as part of this contract at no additional cost to the City. B. The Contractor shall inspect the site to observe actual working conditions and restrictions. Question Deadline 12/27/2024 Email all questions to Sewer_Trunk_Rehab_Grimes_Mercy_Bid_Questions@docs.ebuilder.net by 4:00 p.m., no later than 7 business days prior to the bid opening. Sewer Trunk Rehabilitation on Grimes, Mercy, and Woodland Ave The Payment of Prevailing Wages is Required on this Project. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value $35,000,000 License Requirements "A" California State Contractor License Project Duration 395 Working Days Scope of Services The purpose of this project is to extend the useful life of the City of Modesto's West Trunk and Emerald Trunk Sewer Lines. The scope of this project will include CIPP lining of approximately 17,395 LF of 54-inch sewer trunk line along Mercy and Grimes Ave with a small additional portion along Paradise Road, 5,421 LF of 27-inch sewer trunk line along North Emerald and Woodland Ave, and 1,982 LF of 18-inch sewer trunk line along Woodland Ave. The project will also rehabilitate eighteen (18) 48-inch manholes and eight (8) 60-inch manholes with an epoxy coating system. Lastly, eight (8) 72-inch manholes will be added to facilitate the CIPP lining process. Document notes The entire deposit is refundable if plans and specifications are returned in good condition within fifteen calendar days after Council action. . For shipping requests, a Federal Express or UPS account must be provided, or other arrangements may be requested. Shipping costs are non-refundable. Pre-Bid Meeting notes Meeting ID: 273 109 612 160 Passcode: dbNuqr To dial in by phone: +1 559-248-1927 Phone conference ID: 932 834 795# Email all questions to Sewer_Trunk_Rehab_Grimes_Mercy_Bid_Questions@docs.e-builder.net by 4:00 p.m., no later than 7 business days prior to the bid opening.

Bid Results

Water / Sewer

$22,830,295.00

Public - City

Paving, Site Work

67

22

40

9

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
8
Bidding Soon
1,437
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2025

March 21, 2025

Project location map

Multiple Locations, Modesto, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.