BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2025 at 7:00 PM

Updated January 17, 2025

Site work and paving for a mixed-use development in Walnut Creek, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This work includes but is not limited to The limits of clearing and grubbing shall be of sufficient area and depth to complete the work as shown on the plans or described in the Special Provisions. Clearing and grubbing shall consist of removal and disposal of existing weeds, brush and other unsuitable material within and along edge of pavement or concrete, traffic bars, and raised pavement markers. Unless otherwise specified, the Contractor shall protect trees as specified in the City Municipal Code at their expense. Trees to be removed shall be removed in such a manner as to not injure standing trees, plants and improvements which are to be preserved. Recycling of Construction and Demolition Materials. Protection of Storm Drain system from pollutants. Developing water supply and applying water, including water used for dust control. The Project includes, but is not limited to, performing the following Work Pavement Marking Removals Striping, Pavement Markings, and Green Bike Lanes Traffic Signage Traffic Control This Project is on the following streets in the City of Walnut Creek: Trinity Avenue from Oakland Boulevard to North California Boulevard Oakland Boulevard from Trinity Avenue to Mount Diablo Boulevard Trinity Avenue & Oakland Boulevard Bike Improvement Project License Requirements Class A General Engineering Contractor Liquidated Damages $3,000 per day Estimated Bid Value $130,294.50 Project Duration 15 Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 11/27/2024 at 5:00 PM PT Online Q&A Yes Scope of Services The Project includes, but is not limited to, performing the following Work: o Pavement Marking Removals o Striping, Pavement Markings, and Green Bike Lanes o Traffic Signage o Traffic Control

Bid Results

Roads / Highways

$145,885.00

Public - City

Paving, Site Work

12

7

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
13
Bidding Soon
1,878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

Project location map

Trinity Ave & Oakland Blvd, Walnut Creek, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.