Site work and paving for a road / highway in Walnut Creek, California. Working plans call for site work for a road / highway; and for paving for a road / highway.

The Contra Costa Transportation Authority (Authority) is seeking proposals from qualified consultants to provide Pre-Construction and Construction Management Services for the I-680/SR4 Interchange Improvement Project Phases 2A (CM Optional) and 4. The contract will have two task orders: o Task 1: Provide Pre-Construction Services for Phases 2A and 4. o Task 2: Provide Construction Management Services for Phase 4 with an option for Phase 2A. Online Q&A Yes Q&A Deadline 01/22/2025 5:00 PM (PST) Phase 2A: Phase 4: RFP No. 24-10 Contra Costa Transportation Authority Page 1 In cooperation with the California Department of Transportation (Caltrans), the Authority proposes the 1-680/SR 4 Interchange Improvements Project which would improve the operational efficiency of the interchange, reduce traffic congestion and delays, improve safety, eliminate short weaving and merging sections, and provide direct access between 1-680 and Pacheco Boulevard. The project has been divided into five stages with Phase 3 being the only phase completed to date. Phases 2A and 4 are described as follows: Construct a two-lane direct connector from SB 1-680 to EB SR 4 Realign northern portion of SB 1-680 to WB SR 4 diagonal ramp Remove existing loop ramp from SB 1-680 to EB SR 4 Construct auxiliary lane along EB SR 4 from the entrance of the direct connector stated above to 1,000 feet north of Peralta Road Along EB SR 4, realign Solano Way off-ramp and on-ramp to accommodate above mentioned auxiliary lane Remove the Collector-Distributor (C-D) road parallel to SB 1-680 and realign entrance of loop ramp from WB SR 4 to SB 1-680 Widen southern portion of diagonal ramp from NB 1-680 to EB SR 4 from 1 to 2 lanes Install ramp metering facility for SB 680/EB SR 4 on-ramp PRE-CONSTRUCTION AND CONSTRUCTION MANAGEMENT SERVICES FOR INTERSTATE 680/STATE ROUTE 4 INTERCHANGE IMPROVEMENTS PHASES 2A (CM OPTIONAL) AND 4 Widen diagonal ramp from EB SR 4 to SB 1-680 from 1 to 2 lanes. Widen portion of loop ramp from WB SR 4 to SB 1-680 from 1 to 2 lanes. This will require widening the existing bridge over Grayson Creek Bridge. Construct auxiliary lanes as follows: o Along SB 1-680 from the EB SR 4 to SB 1-680 to the 300 feet to the north of Center Avenue Install ramp metering facility for SB 1-680 on-ramp The estimated construction cost for Phases 2A and 4 is approximately $173.5 Million.

Final Planning

Roads / Highways

$173,500,000.00

Public - County

Paving, Site Work

487

8

4

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
537
Active Projects
221
Bidding Soon
3,053
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

August 17, 2026

Project location map

I-680, Walnut Creek, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.