BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Demolition, site work and new construction of a civil project in Kingsland, Georgia. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Project Scope: Bidder agrees to furnish all materials and equipment and perform all labor necessary to construct the water treatment plant as shown on the Drawings and as specified. More specifically, the work shall include, but not be limited to, a new deep well, degasifier, 100,000 gallon clearwell, operations building, bulk chemical storage and feed systems, high service pump station, on-site generator, electrical work and a new SCADA system. The work also includes demolition, clearing and grubbing, earthwork, preloading of site, settlement monitoring program, site work, yard piping, erosion and sediment control measures, grassing, construction staking, mobilization/demobilization, bonds, insurance, delivery of materials, take offs and all other appurtenances required for completion of the work as shown and as specified. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State Law. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Question Deadline 12/12/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Questions to Engineer may be submitted via online.

Award

Water / Sewer

$2,054,961.00

Public - City

Demolition, New Construction, Site Work

93

35

13

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
54
Bidding Soon
907
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 20, 2025

Project location map

To Be Determined, Kingsland, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.