BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Littleton, Colorado. Completed plans call for site work for a water / sewer project.

48-inch pipe repair and optional 54-inch pipe repair, Tri-Lakes Project Office, Chatfield Lake, Colorado. *The estimated value is between $100,000 and $250,000* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope of Work. The Chatfield Dam and reservoir is a dam and artificial lake on the South Plate River, south of Littleton in Colorado, United States. The Government intends to rehabilitate the 48-inch diameter irrigation auxiliary pipe and optional work is anticipated for the rehabilitation of the 54-inch diameter irrigation auxiliary pipe. The 48-inch pipe appears to leak near the switch drain building through which water is transmitted to the Last Chance Ditch. The ground above the pipe is continuously wet as water is running permanently all year besides the period of late November through late February when it's out of service. An exposition of the pipe has revealed that one joint is leaking. The 54-inch pipe leads to the junction of a fish hatchery and continues to the city ditch on the right side of the valley to supply water for the Nevada Ditch. It has been observed a wet spot approximately above the cast iron tee, placed in 1991. Due to the proximity of the leak with the toe of the dam embankment, the pipe could not be exposed. The repair should occur at the interior face of the pipe which is a confined space. The 54-inch pipe runs water all year and only stops servicing for four days in February. The Contractor shall provide all equipment, labor, and materials to repair the existing leaking 48-inch diameter pipe and optionally repair the 54-inch diameter pipe to return the pipes to their respective functional states without leaks. The pipes must be repaired with products supplied by the contractor and installed per the manufacturer's recommendations and applicable standards and regulations for city water supply systems in order to extend the minimum service life for another 25 years or longer

GC Bidding

Water / Sewer

$250,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
39
Bidding Soon
1,003
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 20, 2025

img_map_placeholder

Chatfield Dam, Littleton, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.