BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated January 24, 2025

Renovation of a mixed-use development in Littleton, Colorado. Completed plans call for the renovation of a theater / auditorium.

Reference Number 0000370944 The District seeks one qualified vendor to submit two pricing options for replacing the auditorium seating at Columbine High School. The Respondent must provide detailed pricing options for both low-grade and mid-grade seating solutions. This project consists of replacing approximately 571 auditorium seats. It will include the removal and installation of new seating meeting ADA. All work must be completed prior to June 30, 2025. Construction Timeline: Construction to begin no earlier than May 24, 2025. Construction and all billing to be completed no later than June 30, 2025 SCOPE OF THE WORK The Contractor will furnish all tools, equipment, machinery, supplies, superintendence, insurance, transportation and other construction accessories, services and facilities specified or required to be incorporated in and form a permanent part of the completed work. In addition, the contractor shall provide and perform all necessary labor in a first class and workmanlike manner and in accordance with the conditions and prices stated in the Bid Proposal and the requirements, stipulations, provisions and conditions of the Contract Documents as defined in the attached General Conditions, said documents forming the contract and being as fully a part thereof as if repeated verbatim herein; perform, execute, construct and complete all things mentioned to be done by the Contractor and all work included in and covered by the Owner's official award of this contract to the Contractor, such award being based on the acceptance by the Owner of the Contractor's bid, or part thereof. Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Installation Required - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % Question Deadline 01/14/2025 at 10:30 AM MT Questions are submitted online No, Any contact regarding this Bid must be done in writing through Jade Paz, Senior Purchasing Agent jade.paz@jeffco.k12.co.us . This restriction does not apply to District initiated communications to satisfy clarification questions. SCOPE OF WORK This project consists of replacing approximately 571 auditorium seats. It will include the removal and installation of new seating meeting ADA. New seating must comply with current ADA Requirements, including but not limited to: o Proposed 4 wheel chair spaces between the two center sections. o Proposed 2 wheel chair spaces in first row outside of both left and right sections (4 total).o Permanent fixed companion seats to be included in bid (match proposed seating). o Include designated aisle seats as required (1 per seating section, 6 total) Include the required number of ADA seats in the final layout. Maximize the total number of seats. The contractor is responsible for final layout drawings that are to be approved by Jeffco Project Manager. Changes to the existing slab may be required depending on the final layout. Removal of existing seats bolted to the ground requires that the bolts are either removed or flush with the existing concrete. Ardex is acceptable if patching is needed. Carpet is to be protected and remain in place. All work to meet current Jeffco Technical Guidelines. Existing floor plans are not exact, field verification is required

Post-Bid

Theaters / Auditoriums

$200,000.00

Public - County

Renovation

4

5

4

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
116
Bidding Soon
1,233
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

May 24, 2025

Project location map

6201 S Pierce St, Littleton, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.