Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2025 at 8:00 PM
Updated March 19, 2025
Site work for a water / sewer project in Littleton, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000373062 The City of Littleton is requesting proposals for repair and replacement of underground storm sewer, and associated roadway repair. PROPOSERS HAVE THE OPTION TO BID ON: only GROUP 1 pipe replacement work; OR only GROUP 2 pipe lining work; OR GROUP 3 both pipe replacement and pipe lining work As described in Attachment E, Plans and Specifications, the city needs to replace storm infrastructure underneath the intersection of Belleview and Federal. The project will include full street closure and excavation. Work shall be completed within one (1) year of the Notice to Proceed. Question Deadline 01/30/2025 at 12:00 PM MT Questions are submitted online Yes, All inquiries and questions regarding this RFP must be submitted electronically in online. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Installation Required - Insurance Required - Local Service Required Bonding Requirements - Bid Bond 5 % - Performance & Payment 100 % The City reserves the right to award all or partial work to proposer(s), including any add alternates. Project Description o Background o Scope of Work o Bid Options o This project will replace current Corrugated Metal Pipes that are failing and lining two adjacent pipes. o This will be open excavating across Federal on the south side of Belleview. o Full road closure of Federal south of Belleview will be required. The city would like to re-open the west side (south-bound Federal) as soon as practical, and the contractor will be able to stage in northbound Federal lanes. o There is heavy traffic traveling southbound on Federal before hitting Belleview. Traffic control is a large component of this project; traffic control must be closely monitored. o Therefore, it's recommended bidders have a traffic division or outsource traffic control if need be. o The contractor will need to complete a full check of traffic control at least once per day. o There's currently a bit of street degradation. o The contractor will need to obtain right-of-way permits from CDOT for traffic control. o The contractor will also need to coordinate with City of Englewood, whose jurisdiction is on the north side of Belleview. o This project will result in a large detour using Prince & Santa Fe, and the contractor will need to make sure the public's aware at all times and provide variable messaging boards. o The contractor must follow CDOT standards. o The junction box is not in great shape and will be replaced with cast-in-place structure. (note: this is correction from the pre-proposal meeting) o The corrugated metal pipe connects to the junction box. o Soil testing will be handled by the city--bidders should not include this as part of your bid. o Bidders have three options to bid on: o only GROUP 1 pipe replacement work; OR o only GROUP 2 pipe lining work; OR o GROUP 3 both pipe replacement and pipe lining work If bidding on GROUP 3, ideally the lining work will occur at the same time as pipe replacement work to alleviate the need for double traffic control
Award
Water / Sewer
$1,122,795.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2025
March 17, 2025
W Belleview Ave & S Federal Blvd, Littleton, CO
Related To This Project
Littleton, CO
Bid Date: Feb 03 2025
Littleton, CO
Bid Date: Feb 14 2025
Littleton, CO
Bid Date: Mar 06 2025
Littleton, CO
--
Littleton, CO
Bid Date: Mar 07 2025
Littleton, CO
Bid Date: Mar 13 2025
Littleton, CO
Bid Date: Jan 22 2025
Littleton, CO
--
Littleton, CO
Bid Date: Jan 14 2025
Littleton, CO
Bid Date: Jan 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
