EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a service station / car wash facility in Mustang, Oklahoma. Completed plans call for site work for a service station / car wash facility.

The equipment shall be new and unused, and shall meet or exceed the attached specifications. Bid price shall include delivery and installation of the specified equipment as well as all other materials and services as described in the Bid Specifications. Equipment shall be installed at the Wild Horse Park, 1201 N. Mustang Road, Mustang, OK. Bids will be opened and read aloud on the above date by the City Clerk or her Designee. Bids will be reviewed by staff and recommendations made then placed on the next regularly scheduled meeting for Council's approval. Bids must be sealed and marked "EV Charger Project" with the name and address of the Bidder in the upper left-hand corner of the envelope and mailed or delivered to the attention of Tammi Noblitt, City Clerk, City of Mustang, 1501 N. Mustang Road, Mustang, Oklahoma 73064. All Bidders must sign Business Relationship, Anti-Collusion, a certified check, cashier's check or bid bond equal to five percent (5%) of the bid, Certificate of Non-Discrimination Statements, and Verification of Non-Boycotting of Energy Companies. Each of these statements shall be submitted with the sealed bid. Failure to submit these required documents with a Bid shall be cause for rejection of the Bid. The City of Mustang is exempt from payment of Federal, State and local taxes. The City of Mustang reserves the right to reject any or all bids or to waive any informality in the bidding. The City of Mustang further reserves the right to award the bid to the lowest responsible bidder. The City of Mustang further reserves the right to issue change-orders on awarded projects. SCOPE OF WORK The project being bid is for all of the following: Two (2) complete dual level III 200kW DC fast chargers and associated equipment, charger provisioning, software and data plan, warranty and monitoring, and remote service diagnostics; All architectural and engineering design necessary for the installation of two (2) - 200kW electric vehicle chargers at Wild Horse Park; All site work necessary for the installation of two (2) - 200kW electric vehicle chargers at Wild Horse Park including coordination with utility provider for utility provider installation of infrastructure necessary for connection to the City's electric provider; The bid includes comprehensive training for city staff to ensure familiarity with and effective operation of the EV charging equipment. This training will cover all necessary aspects of equipment use, maintenance, and troubleshooting, and providing city staff with the skills needed for ongoing operation The project being bid is for: Two (2) complete dual level III 200kW DC fast chargers and associated equipment, charger provisioning, software and data plan, warranty and monitoring, and remote service diagnostics; All architectural and engineering design necessary for the installation of two (2) - 200kW electric vehicle chargers at Wild Horse Park; All site work necessary for the installation of two (2) - 200kW electric vehicle chargers at Wild Horse Park including coordination with utility provider for utility provider installation of infrastructure necessary for connection to the City's electric provider; The bid includes comprehensive training for city staff to ensure familiarity with and effective operation of the EV charging equipment. This training will cover all necessary aspects of equipment use, maintenance, and troubleshooting, providing city staff with the skills needed for ongoing operation. Location for installation of electric vehicle chargers is: Wild Horse Park 1201 N. Mustang Rd Mustang, OK 73064

Award

Service Station / Car Wash

$355,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
42
Bidding Soon
506
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

img_map_placeholder

1201 N Mustang Rd, Mustang, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Level III Electric Vehicle Charging Station Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.