Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 6, 2025 at 7:00 PM

Updated September 23, 2026

Site work, paving and new construction of a mixed-use development in Granger, Iowa. Completed plans call for the construction of a educational facility; for site work for a educational facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The successful Bidder will be required to furnish a Certificate of Insurance and Performance and Labor and Material Payment Bonds both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. Scope of work includes, but is not limited to, the following: Construction of a new middle school consisting of a single-story building including Classrooms, Kitchen/Cafeteria, Gymnasium, Administrative Area and Auxiliary Spaces. The new construction is approximately 80,000 square feet. Work to commence on or about April 1, 2025, and be substantially complete on or before July 31, 2026. Final Acceptance of the Project shall be on or before October 23, 2026. Separate lump-sum bid for the Woodward-Granger New Middle School will be received for: Bid Package No. 03-1 – Concrete Foundations Bid Package No. 03-2 – Interior Concrete Slabs & Concrete Polish Bid Package No. 04-1 – Unit Masonry Bid Package No. 05-1 – Precast Concrete, Structural Steel, Joist, Deck & Metal Fabrication Bid Package No. 06-1 – General Construction Bid Package No. 07-2 – Metal Wall Panel, Flashing & Decorative Metal Bid Package No. 07-3 – Membrane Roofing Bid Package No. 08-1 – Aluminum & Glazing Bid Package No. 09-1 – Gypsum Board Assemblies, Acoustical Treatments, Wall Coverings, Ceiling, Paint & Coatings Bid Package No. 09-5 – Ceramic Tile & Flooring Bid Package No. 09-6 – Athletic Flooring & Equipment Bid Package No. 11-1 – Food Service Equipment Bid Package No. 21-1 – Fire Suppression Systems Bid Package No. 22-1 – Plumbing & HVAC Bid Package No. 26-1 – Electrical, Communications, Electronic Safety & Security Bid Package No. 31-1 – Site Demolition, Earthwork & Landscaping Each Bid shall be accompanied by a Bid Security in the amount of five percent (5%) of the total bid submitted. Separate lump-sum bid for the Woodward-Granger New Middle School will be received for: Bid Package No. 03-1 - Concrete Foundations Bid Package No. 03-2 - Interior Concrete Slabs & Concrete Polish Bid Package No. 04-1 - Unit Masonry Bid Package No. 05-1 - Precast Concrete, Structural Steel, Joist, Deck & Metal Fabrication Bid Package No. 06-1 - General Construction Bid Package No. 07-2 - Metal Wall Panel, Flashing & Decorative Metal Bid Package No. 07-3 - Membrane Roofing Bid Package No. 08-1 - Aluminum & Glazing Bid Package No. 09-1 - Gypsum Board Assemblies, Acoustical Treatments, Wall Coverings, Ceiling, Paint & Coatings Bid Package No. 09-5 - Ceramic Tile & Flooring Bid Package No. 09-6 - Athletic Flooring & Equipment Bid Package No. 11-1 - Food Service Equipment Bid Package No. 21-1 - Fire Suppression Systems Bid Package No. 22-1 - Plumbing & HVAC Bid Package No. 26-1 - Electrical, Communications, Electronic Safety & Security Bid Package No. 31-1 - Site Demolition, Earthwork & Landscaping

Bid Results

Educational

$27,365,002.00

Public - City

New Construction, Paving, Site Work

207

33

111

22

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
35
Bidding Soon
767
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

April 1, 2025

Project location map

2601 Sycamore St, Granger, IA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed