BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 13, 2025 at 8:00 PM

Updated October 14, 2025

Site work for a water / sewer project in Charleston, West Virginia. Completed plans call for site work for a water / sewer project.

REBID NOTICE: We will be separating the plumbing work which will be Contract 1 and the kitchen replacement will be Contract 2 into separate contracts. Both will have the same wage determination. Both contracts will have to closely coordinate their work where the kitchens are being replaced on 2 stacks. All the work shown on the drawings and in the Specifications shall be performed by the Contractor. Work not shown in the following summary does not relieve the Contractor from performing the Work. The cost of work items shown on the drawings but not shown in the summary shall be included in the associated work item. The Base Bid shall include the work as scheduled, detailed and shown on the Drawings and the Specifications. For changes of the Work, including adding and/or deleting work items, and upon written instruction from the Architect, the following work item cost breakdown shall prevail. All work items shall include the cost of material, labor, contractor's profit and overhead for a complete installation. CLARIFICATION NO. 1 Charleston Housing will waive the 50 mile office requirement but must provide a 24 hr guarantee to be on site. Contractors shall have 5 years minimum experience in the work being performed. Charleston-Kanawha Housing reserves the right to reject any or all bids or to waive any informalities in the bidding process. A certified check or bank draft, payable to Charleston-Kanawha Housing Par Value U. S. Government bonds or a satisfactory bid bond executed by the acceptable sureties in an amount equal to five percent of the bid shall be submitted with each bid. Bids can be hand delivered to: Charleston - Kanawha Housing 1525 Washington St. West Charleston, West Virginia 25387 Attn: Anthony Long Modernization Coordinator or mailed to: Charleston-Kanawha Housing Post Office Box 86 Charleston, West Virginia 25321-0086 Attn: Anthony Long Modernization Coordinator The goal of 20% for minorities and women applies nationwide. Any questions pertaining to these specifications shall be directed to Anthony Long, Modernization Coordinator at (304) 993-1063, or the Architect, ADKINS DESIGN Inc., Larry Adkins at (304) 984-2415.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Site Work

13

12

4

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
29
Bidding Soon
789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

November 10, 2025

Project location map

1319 Lee St E, Charleston, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.