BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 29, 2024 at 7:00 PM

Updated December 20, 2024

Site work, paving, outdoor lighting and renovation of a mixed-use development in Richland, Michigan. Completed plans call for the renovation of a educational facility; for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and sidewalk / parking lot.

Gull Lake Community Schools - 2018 Bond Project - Additional Improvements PROJECT DESCRIPTION: The Project consists of upgrades to four buildings, Bedford, Kellogg Early Childhood, Middle School, and Ryan Intermediate as one project, considered Additional Improvements to the 2018 Bond Project. Work is scheduled for early June to Mid-August of 2025. Kellogg Early Childhood is an 80,600 SQFT single-story building. Project work is approximately 11,000 SQFT. Exterior site work will include entry drive and parking lot asphalt replacement. Project work will include remodeling restrooms. Mechanical improvements will include new classroom fan coil units, condensing units, and new controls. Plumbing improvements will include domestic water lines and plumbing fixture replacements. Electrical improvements will include the replacement of parking lot lighting. The Middle School is a 140,900 SQFT single-story building with project work remodeling to include visual display boards in classrooms, Life Skills remodel, interior corridor gypsum repairs, and select areas for floor coatings. Mechanical improvements will include new unit ventilators and condensing units. Plumbing improvements will include domestic water lines and plumbing fixture replacements. Electrical improvements will include new lighting and lighting controls. BID SECURITY: Bid Security in the amount of five percent (5%) of Base Bid(s) shall accompany each Proposal (refer to Section 00 4313) PERFORMANCE BOND AND PAYMENT BOND: All Contractors bidding on Work in excess of $50,000.00 must be bondable and must include in their Proposal the cost for furnishing a Performance Bond and Payment Bond listing Gull Lake Community Schools as Obligee (refer to Section 00 6100). CONTRACTOR QUALIFICATION STATEMENT: A current Contractor Qualification Statement must be on file with Miller-Davis Company in order to be awarded a Contract (refer to Specification Section 00 4513). This request will be sent to a Contractor's designated contact via an emailed link from Trade Tapp. As required by State Law (P.A. 232 of 2004), all bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between Gull Lake Community Schools or any employee of the bidder and any member of the school board or the superintendent of the school district; and a sworn and notarized Affidavit of Compliance-Iran Economics Sanctions Act. The District shall not accept a bid that does not include the sworn and notarized disclosure statements. The Owner intends to award Contracts on or about Tuesday, January 20, 2025. As required by State Law (P.A. 232 of 2004), all bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between Gull Lake Community Schools or any employee of the bidder and any member of the school board or the superintendent of the school district; and a sworn and notarized Affidavit of Compliance-Iran Economics Sanctions Act. The District shall not accept a bid that does not include the sworn and notarized disclosure statements. Bid date notes Bids submitted virtually cannot be opened prior to the bid due date and time. Any firm that cannot comply with electronic bid submission requirements must contact Janice Ballentine at (269) 760-8721 / jballentine@miller-davis.com at least 48 hours before bids are due to make alternative arrangements. All Bids submitted may be withdrawn for a period of sixty (60) consecutive calendar days after the Bid Date. The Owner reserves the right to withdraw this bid request at any time and for any reason and to issue such clarifications, modifications and/or amendments as it may deem appropriate. The Owner also reserves the right to waive any informality in or reject any part of a bid, accept or reject any or all bids, alternates, or proposals, and to accept those bids, alternates, or proposals that, in Owner's judgement, serve the Owner's best interests. It is the policy Gull Lake Community Schools and Miller-Davis Company that minority and women's business enterprises shall have an equal opportunity to participate as Contractors for this project. Miller-Davis Company is an Equal Opportunity Employer, and we fully and actively support equal opportunities for everyone. All qualified bidders are encouraged to submit a Proposal for this project regardless of race, color, religion, gender, sexual orientation, age, national origin, disability or veteran status.

Post-Bid

Educational

$700,000.00

Public - City

Outdoor Lighting, Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
59
Bidding Soon
1,426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

June 2, 2025

Project location map

Multiple Locations, Richland, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.