BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Demolition, site work, new construction and addition to a mixed-use development in Richland, Michigan. Completed plans call for the addition of a 2,185-square-foot, one-story above grade pre-engineered storage facility; for the construction of a 80,600-square-foot theater / auditorium; for the demolition of a pre-engineered storage facility; for site work for a theater / auditorium; 6,620-square-foot, one-story above grade pre-engineered storage facility; pre-engineered storage facility; 1,500-square-foot theater / auditorium; and theater / auditorium.

The Project consists of new storage additions to two existing buildings: Maintenance and High School Performing Arts Center (PAC) as one project, considered Storage Additions. Work is scheduled for early June to mid-October of 2025. The Maintenance Building is an approximate 6,620 SQFT single-story building. The new single-story addition is approximately 2,185 SQST for unheated storage. Improvements include roof-framing of pre-engineered wood roof trusses with slopes to match the existing Maintenance Building. Wood framing with metal panel siding. Slab on grade and perimeter trench footing with concrete piers for truss bays. Electrical includes lighting and general power. Exterior work includes site preparation, fencing, asphalt and concrete paving. The High School Auditorium Performing Arts Center (PAC) is an 80,600 SQFT single-story building. The new single-story addition is approximately 1,500 SQFT for unheated storage. Improvements include metal roof deck and steel roof beams. Roof framing will resemble existing PAC roof framing. Metal framing with fiber-cement siding. Slab on grade, spread footings and perimeter foundations. Fire suppression improvements consist of a dry system. Electrical improvements consist of lighting and general power. Exterior work includes site preparation and concrete paving. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. As of today, March 27,2025. A construction Manager has been selected for this project. A construction is scheduled to start in June 2025 and end in August 2025.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$3,000,000.00

Public - County

Addition, Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
26
Bidding Soon
1,457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 1, 2025

Project location map

Multiple Locations, Richland, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.