BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2025 at 8:00 PM

Updated September 23, 2025

Site work and paving for a road / highway in House Springs, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Pavement resurfacing, upgrade guardrail and replace signage from Rte. 30 to east of Buckeye Valley Road. Route: RT MM County: Jefferson As of September 22, 2025, project engineer selected, construction start late Spring 2025. Completion expected late 2025. MODOT- Pavement resurfacing, upgrade guardrail and replace signage from Rte. 30 to east of Buckeye Valley Road. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. _______________________________________________________________________________________________________________________________________________________________________________________ Job No: J6S3575 Location: Route MM from Route 30 to Buckeye Valley Road. Proposed Improvement: The proposed improvements include pavement rehabilitation and resurfacing, guardrail upgrades, sign replacement, pavement marking and traffic control. DBE Goal 0% Construction and Materials testing and inspection The consultant will provide professional, technical and other personnel, equipment, material, and all other things necessary for inspection, testing and administration of the project along Route MM in Jefferson County. Services to be provided by the consultant include field inspections of all work and contract activities, on-site quality assurance materials testing, project documentation, material reporting, measurement and payment, change order and estimate generation, attendance of meetings, and close out of customer service call reports. The method of Contractor Selection has not been Determined at this time. MO DOT - RFQ Engineering - Pavement Rehabilitation and Resurfacing, Guardrail Upgrades, Sign Replacement, Pavement Marking and Traffic Control

Under Construction

Roads / Highways

$3,500,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

Project location map

State Hwy MM, House Springs, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.