Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 29, 2024 at 7:00 PM
Updated October 1, 2024
This is a service / maintenance or supply contract in Avon Lake, Ohio. Contact the soliciting agency for additional information.
Request for Letters of Interest Lear Road, Walker Road, and Krebs Road Traffic Study The City of Avon Lake is requesting Letters of Interest (LoI) from qualified firms to provide Traffic Engineering Services for a Traffic Study. The Scope of work is included below. Communication Restrictions During the time period between advertisement and the final consultant selection, communication with consultants (or their agents) shall be limited as follows: Communications which are strictly prohibited: Any discussions or marketing activities related to this specific project. Allowable communications include: Technical or scope of services questions specific to the project or Request for LoI requirements. Qualifications The following ODOT Prequalification categories are required for this project, either solely from the Prime Consultant or as a combination of the Prime Consultant and Subconsultants: Non-Complex Roadway Design; Basic Traffic Signal Design Traffic Signal System Design Scope of Services The selected consultant will prepare a Traffic Study for Lear Road from Krebs Road to Walker Road, Walker Road from Lear Road to Brennan's Court, and Krebs Road from Lear Road to Hunt Club Way. The study will account for existing and future traffic volumes due to ongoing residential development adjacent to Lear Road and Walker Road. While some of the proposed development is already constructed, the remaining interconnecting streets are shown in Attachment 1 for reference only. The scope of services includes: Conducting traffic counts at the intersections located along Lear Road, Walker Road, and Krebs Road within the crossroad boundaries listed above. Perform Trip Generation for the residential development in the AM and PM peak periods using Institute of Traffic Engineers (ITE) trip generation methodology based on the number and type of residences being constructed. Prepare Capacity Analyses for each intersection. Analyze stop-control operation as well as signalization, and prepare Signal Warrant Analyses where warranted. Summarize recommendations for each intersection in a traffic study report, including the recommended intersection control methods and recommendations for any dedicated turn lanes or other identified roadway or intersection improvements. For the purposes of the traffic study, assume the existing barricade at Liberty Rose Drive is not present. Schedule It is anticipated the selected Consultant will be authorized to proceed by February 10, 2025. The study is to be completed and submitted to the City of Avon Lake by June 6, 2025. Selection Procedures The City of Avon Lake will directly select a consultant based on the Letter of Interest. The requirements for the LoI are included below. The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2025

Multiple Locations, Avon Lake, OH
Related To This Project
Avon Lake, OH
Bid Date: Feb 13 2025
Avon Lake, OH
Bid Date: Apr 16 2025
Avon Lake, OH
--
Avon Lake, OH
Bid Date: Nov 27 2024
Avon Lake, OH
Bid Date: Dec 11 2024
Avon Lake, OH
--
Avon Lake, OH
Bid Date: Nov 21 2024
Avon Lake, OH
Bid Date: Oct 04 2024
Avon Lake, OH
Bid Date: Jul 25 2024
Avon Lake, OH
Bid Date: Jul 18 2024
Avon Lake, OH
Bid Date: Jul 19 2024
Avon Lake, OH
Bid Date: May 17 2024
Avon Lake, OH
Bid Date: May 02 2024
Avon Lake, OH
Bid Date: May 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.