BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Shorewood, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

https://www.shawlocal.com/the-herald-news/2025/05/25/shorewood-bridge-remaining-1-lane-indefinitely/ The Seil Road Bridge in Shorewood will remain a one-lane bridge indefinitely. However, as of Thursday, May 22, new bridge and road designs are 100% complete, according to a news release from the village of Shorewood. The Seil Road and Bridge Reconstruction Project includes the construction of a new bridge with streetlights, pedestrian access and mixed-use path, according to the release. The project also includes changing Seil Road from a two-lane rural cross-section to a three-lane rural cross-section, along with adding two mini roundabouts, according to the release. But per the Illinois Department of Transportation‘s annual bridge inspection report, the Seil Road Bridge will remain reduced to one lane – in the center of the bridge – under a 5-ton weight limit indefinitely, according to the release. The Illinois Department of Transportation required the weight limit be reduced to 5 tons after an April 23, 2023, bridge inspection. Traffic moves along over the West Seil Road bridge on Saturday, May 20 in Shorewood. The village posted a new weight limit for the bridge. Traffic moves over the West Seil Road bridge May 20, 2023, in Shorewood. The village posted a new weight limit for the bridge. (Gary Middendorf – gmiddendorf@shawmedia/Gary Middendorf) In May 2024, a partial bridge closure was added due to the deterioration of the bridge beams, according to the release. The beams have not deteriorated further since shifting traffic to the middle of the bridge, according to the release. The village “will continue to enforce the lane reduction to keep live loads off the problem beams while providing safe travel to westbound traffic,” according to the release. Eastbound traffic still is forbidden to use the bridge, according to the release. Except for residents, motorists should avoid the bridge and use suggested detours, according to the release. For instance, motorists should travel south on River Road to eastbound Mound Road, to northbound Frontage Road back to Seil Road, according to the release. Except for residents, motorists should avoid the Seil Road Bridge in Shorewood and use suggested detours. Except for residents, motorists should avoid the Seil Road Bridge in Shorewood and use suggested detours. (Photo provided by the village of Shorewood) Seil Road Bridge was constructed in the early 1980s, and in 2019, the village saw the bridge needed to replaced, according to the village. Each year, the village is required by the state to have a licensed structural engineer inspect the Seil Road Bridge due to the bridge’s age and condition. In 2021, Shorewood acquired Christopher B. Burke Engineering for phase two engineering design, according to the release. Shorewood is now working with several property owners near the project location for “securing additional right-of-way along the road and parkways, and obtaining temporary easements for construction,” according to the release. Although most negotiations are complete, Shorewood began the eminent domain process six months ago, which can last between six and 24 months before the project can go out to bid, according to the release. Once a bid is awarded, construction could take 18 to 24 months, according to the release. For the past five years, Shorewood has been budgeting for the Seil Road Bridge reconstruction and the associated road construction as part of its capital improvement plan, since the two projects cost a total of $12 million, according to the release. Shorewood was awarded a $4 million Surface Transportation Program Grant for the bridge in 2020, according to the release. ----------------------------------------------------------------------------------- Route/ City - Seil Rd Shorewood County - Will Location - At Dupage River (Bridges: 099-4253) (Sec. # 21-00047-00-wr) Type of Work / TAMP - Bridge Replacement As of November 14 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. ILDOT - Reconstruction - Bridges (Seil Rd) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$4,400,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
259
Bidding Soon
3,436
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.