Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 14, 2025 at 7:00 PM
Updated November 15, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Shorewood, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
https://www.shawlocal.com/the-herald-news/2025/05/25/shorewood-bridge-remaining-1-lane-indefinitely/ The Seil Road Bridge in Shorewood will remain a one-lane bridge indefinitely. However, as of Thursday, May 22, new bridge and road designs are 100% complete, according to a news release from the village of Shorewood. The Seil Road and Bridge Reconstruction Project includes the construction of a new bridge with streetlights, pedestrian access and mixed-use path, according to the release. The project also includes changing Seil Road from a two-lane rural cross-section to a three-lane rural cross-section, along with adding two mini roundabouts, according to the release. But per the Illinois Department of Transportation‘s annual bridge inspection report, the Seil Road Bridge will remain reduced to one lane – in the center of the bridge – under a 5-ton weight limit indefinitely, according to the release. The Illinois Department of Transportation required the weight limit be reduced to 5 tons after an April 23, 2023, bridge inspection. Traffic moves along over the West Seil Road bridge on Saturday, May 20 in Shorewood. The village posted a new weight limit for the bridge. Traffic moves over the West Seil Road bridge May 20, 2023, in Shorewood. The village posted a new weight limit for the bridge. (Gary Middendorf – gmiddendorf@shawmedia/Gary Middendorf) In May 2024, a partial bridge closure was added due to the deterioration of the bridge beams, according to the release. The beams have not deteriorated further since shifting traffic to the middle of the bridge, according to the release. The village “will continue to enforce the lane reduction to keep live loads off the problem beams while providing safe travel to westbound traffic,” according to the release. Eastbound traffic still is forbidden to use the bridge, according to the release. Except for residents, motorists should avoid the bridge and use suggested detours, according to the release. For instance, motorists should travel south on River Road to eastbound Mound Road, to northbound Frontage Road back to Seil Road, according to the release. Except for residents, motorists should avoid the Seil Road Bridge in Shorewood and use suggested detours. Except for residents, motorists should avoid the Seil Road Bridge in Shorewood and use suggested detours. (Photo provided by the village of Shorewood) Seil Road Bridge was constructed in the early 1980s, and in 2019, the village saw the bridge needed to replaced, according to the village. Each year, the village is required by the state to have a licensed structural engineer inspect the Seil Road Bridge due to the bridge’s age and condition. In 2021, Shorewood acquired Christopher B. Burke Engineering for phase two engineering design, according to the release. Shorewood is now working with several property owners near the project location for “securing additional right-of-way along the road and parkways, and obtaining temporary easements for construction,” according to the release. Although most negotiations are complete, Shorewood began the eminent domain process six months ago, which can last between six and 24 months before the project can go out to bid, according to the release. Once a bid is awarded, construction could take 18 to 24 months, according to the release. For the past five years, Shorewood has been budgeting for the Seil Road Bridge reconstruction and the associated road construction as part of its capital improvement plan, since the two projects cost a total of $12 million, according to the release. Shorewood was awarded a $4 million Surface Transportation Program Grant for the bridge in 2020, according to the release. ----------------------------------------------------------------------------------- Route/ City - Seil Rd Shorewood County - Will Location - At Dupage River (Bridges: 099-4253) (Sec. # 21-00047-00-wr) Type of Work / TAMP - Bridge Replacement As of November 14 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. ILDOT - Reconstruction - Bridges (Seil Rd) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$4,400,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
Seil Rd, Shorewood, IL
Related To This Project
Shorewood, IL
Bid Date: Nov 07 2025
Shorewood, IL
Bid Date: Oct 03 2025
Shorewood, IL
--
Shorewood, IL
--
Shorewood, IL
Bid Date: Aug 28 2025
Shorewood, IL
--
Shorewood, IL
Bid Date: Apr 14 2025
Shorewood, IL
Bid Date: Apr 02 2025
Shorewood, IL
Bid Date: Apr 02 2025
Shorewood, IL
--
Shorewood, IL
Bid Date: Mar 14 2025
Shorewood, IL
Bid Date: Feb 13 2025
Shorewood, IL
--
Shorewood, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
