Published January 14, 2025 at 7:00 PM

Updated January 15, 2025

Site work for a water / sewer project in Loudon, Tennessee. Completed plans call for site work for a water / sewer project.

Loudon Utilities is requesting quotes for the rehabilitation of the Corinth Ground Storage Tank. This project involves interior and exterior coating systems, repairs, and installation of a mixer as outlined in the scope of work below and specifications in Exhibit 1. The successful contractor will be responsible for surface preparation, coating applications, necessary repairs, and installation of equipment per the provided specifications. 1. Surface Preparation Prior to Abrasive Blast Cleaning o Weld flux and spatter shall be removed by power tool cleaning. Sharp projections must be ground smooth, and all welds shall be ground to a smooth contour following NACE Standard SP0178, Designation D. 2. Surface Preparation o SSPC-SP10 Near-White Metal Blast Cleaning required, achieving an angular anchor profile of 1.5 mils as per ASTM D 4417, Method C or NACE RP0287. All surfaces must be clean, dry, and free from contaminants. o Primer must be applied within 6 hours of blasting to prevent flash rust. 3. Repair of Pits o Pits greater than 1/16" and less than half the thickness of the steel must be filled flush to the surrounding substrate with Tnemec Series 215 Surfacing Epoxy following the application of primer. 4. Coating Application o First Coat: Apply Tnemec Series 94-H2O Hydro-Zinc at 2.5 to 3.5 dry mils. Only Tnemec Thinners 41-2, 41-3, or 41-49 shall be used. o Stripe Coat: Apply Tnemec Series N140-1255 Pota-Pox Plus by brush or roller to weld seams, edges, corners, bolts, nuts, and other hard-to-reach areas. Only Tnemec Thinner 41-4 shall be used. o Second Coat: Apply Tnemec Series 21-WH16 "Off White" Epoxoline at 10.0 to 12.0 dry mils. Only Tnemec Thinner 41-88 shall be used. o Total Dry Film Thickness: A minimum of 12.5 mils is required. o For cold weather, Series 44-710 Urethane Accelerator may be added to Series 94-H2O. 5. Seams and Joints o All seams, rafters, and lap joints above the water level should be sealed with Sika-Flex 1 A after the finish coat is applied. The project must be completed within 6 months from the Notice to Proceed. For any questions or requests for additional information, please contact: Brett Zimmerman, PE, PMP Professional Engineer Loudon Utilities 2302 Maremont Parkway Loudon, TN 37774 Office: 865-458-7587 Email: Brett.Zimmerman@loudonutilities.org. All interested contractors should submit the following: 1. Company qualifications and experience in similar projects. 2. A detailed quote including labor, materials, and any other associated costs. 3. Proposed project timeline.

Award

Water / Sewer

$137,757.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
53
Bidding Soon
935
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

February 5, 2025

Project location map

Multiple Locations, Loudon, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.