BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2025 at 7:00 PM

Updated February 25, 2025

Site work for a mixed-use development in Ely, Nevada. Completed plans call for site work for a development; and municipal facility.

The intent of this project is to remove and replace approximately 13.1 miles of existing barbwire fence lines near Ellison Meadows on the Ely Ranger District. SCOPE OF CONTRACT A. The intent of this project is to remove and replace approximately 13.1 miles of existing barbwire fence lines near Ellison Meadows on the Ely Ranger District, HumboldtToiyabe National Foest. B. This project includes the removal of approximately 69,064 feet of existing barbwire fence as a lump sum. Approximately 69,064 feet of new barbwire fence are to be installed including an estimated fifteen 12-foot wire gates. All brace and anchor posts are to be schedule-40, galvanized steel except for wood posts located at the wire gates. Clearing of vegetation is allowed as needed to ensure a straight fence, however heavy equipment will not be allowed to clear the fence lines. Chainsaws are allowed for vegetation clearing. Fence runs should not deviate more than 12-inches from a straight line between braces. C. The Schedule A work includes removing and replacing barbwire fences in locations A, B, and C. D. The Option A work includes removing and replacing barbwire fences in locations D, E, F, G, H, I and J. E. Work shall be performed in accordance with specifications and drawings in the plan sheets, followed by the 'Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14).' The Schedule A work includes removing and replacing barbwire fences in locations A, B, and C. The Option A work includes removing and replacing barbwire fences in locations D, E, F, G, H, I and J. Work shall be performed in accordance with specifications and drawings in the plan sheets, followed by the 'Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14).' Period of Performance: 05/01/2025 to 07/15/2025 The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days. Between $250,000 and $500,000. PROJECT LOCATION From Ely, NV head South on US-6 for 28 miles. Turn right onto National Forest Road 402 (Ellison Creek Road). Travel approximately 13.5 miles to the Project site near the Ellion Guard Station. Total drivetime is about 75 minutes from Ely, NV. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Conservation and Development

$500,000.00

Public - Federal

Site Work

13

7

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
7
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.