EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 11, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Bethlehem, Pennsylvania. Completed plans call for the renovation of a educational facility.

The Bethlehem Area School District is soliciting SEPARATE sealed bids for the following individual Projects in the form of SINGLE prime lump sum contracts. o Liberty High School and Marvine Elementary School Water Heater Replacement o Miller Heights and Farmersville Elementary Schools Grease Trap Replacements o Governor Wolf Elementary School Roof Replacement o Freedom High School Auditorium Renovations MARVINE ELEMENTARY SCHOOL 1425 LIVINGSTON STREET BETHLEHEM, PA 18017 & LIBERTY HIGH SCHOOL 1115 LINDEN STREET BETHLEHEM, PA 18018 The Bethlehem Area School District is soliciting SEPARATE sealed bids for the following individual Projects in the form of SINGLE prime lump sum contracts. Liberty High School and Marvine Elementary School Water Heater Replacement Miller Heights and Farmersville Elementary Schools Grease Trap Replacements Governor Wolf Elementary School Roof Replacement Freedom High School Auditorium Renovations Question Deadline 01/23/2025 All questions must be submitted in writing as follows. Phone calls are not permitted. All questions must be sent to: Bill Niswender, WNiswender@chasolutions.com CHA All questions about the meaning or intent of the Contract Documents are to be directed as listed below. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. All questions must be submitted in writing as follows. Phone call

Bid Results

Educational

$424,280.00

Public - City

Renovation

15

11

4

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
249
Bidding Soon
3,575
All Active Projects
1,655
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

February 27, 2025

img_map_placeholder

Multiple Locations, Bethlehem, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Liberty High School and Marvine Elementary School Water Heater Replacements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.