BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2025 at 7:00 PM

Updated January 25, 2025

Site work and paving for a road / highway in Petoskey, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed work includes 2-inch Cold Milling and HMA overlay, spray applied waterproofing membrane, aggregate should repairs, guardrail, HMA sloped curbs, HMA spillways and riprap. The HMA overlay material will be HMA, 4EML at an application rate of 220 lb/syd with PG Binder 64-28. The Contractor will provide a mix design to MDOT for review and approval. Place and compact aggregate in washout areas along shoulder where necessary. On the culvert structure, apply Spray Applied Waterproofing Membrane to milled surface from Sta 273+40 to Sta 273+65 (length of bridge plus 1 foot beyond each reference line). Remove existing gravel and grass along the shoulder. Install Curb Slp, HMA according to the plan and detail sheets. Install Paved Ditch, HMA and place Riprap, Plain according to the plan and detail sheets. All riprap must be placed above the ordinary high water mark. North of the bridge, along the southbound shoulder, remove 38 feet of existing guardrail and replace with Guardrail Approach Terminal, Type 2M according to the plan sheet. South of the bridge, along the northbound shoulder, remove 101 feet of existing guardrail from the guardrail terminal to the guardrail transition and replace with Guardrail Departing Terminal, Type B, Guardrail, Curved, Type B, 72" Post, and Guardrail, Type B, 72" Post according to the plan sheet. The contractor is responsible for removing the milled material off site. MDOT will provide the traffic control and all work, except guardrail work and restoration, must be completed between 7pm and 6am. All work will be completed in accordance with the Michigan Department of Transportation 2020 Standard Specification for Construction. PROJECT LOCATION The project is located on US-31 (CS 24011) at the Crooked Lake Outlet (C01 of 24011) beginning at STA 271+50 and ending at STA 275+50, in Bear Creek Township, Emmet County. PROJECT COORDINATION The Contractor is advised that other projects in the vicinity may be under construction during the life of this contract. The projects include, but are not limited to 24011-208811: HMA Cold Milling and HMA Resurfacing along US-31 from Graham Road to Blumke Road and from Milton Road to Douglas Lake Road, village of Pellsoton, Emmet County Project Start Date: 10 days after all Contracts are executed. Project Completion Date: May 21, 2025 (All Project Items) PROJECT LOCATION The project is located on US-31 (CS 24011) at the Crooked Lake Outlet (C01 of 24011) beginning at STA 271+50 and ending at STA 275+50, in Bear Creek Township, Emmet County. The Bidder Understands and Agrees That the Emmet County Road Commission Reserves the Right to Reject Any and All Bids; to Waive Irregularities or Informalities; and No Contractual Relationship Shall Exist Between the Bidder and the Emmet County Road Commission for the Work Described Herein Until Such Time As the Contract Has Been Formally Executed by Both the Bidder and the Emmet County Road Commission.

Award

Roads / Highways

$161,395.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
16
Bidding Soon
202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

February 13, 2025

Project location map

US-31, Petoskey, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.