BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2025 at 7:00 PM

Updated January 15, 2025

Renovation of a fire / police facility in Costa Mesa, California. Completed plans call for the renovation of a fire / police facility.

The scope of work generally consists of cleaning, prepping, and reflooring the interior of the first and second floor of the Police Department as well as the first floor and basement corridors. Reflooring will include both rubber base, carpet, and floating LVT. All furniture will be temporary relocated from the area of work. All baseboards are currently removed from the interior repaint project and will need to be reinstalled by the contractor. This project will be completed in multiple phases during off hours - after 5 PM Monday through Friday, to minimize impact on Police Department activities. It is the Contractor's responsibility to determine the phasing layout and to work with the Police Department and the City to ensure the Police Department still has access throughout the entire building during construction. Each bidder must submit a certified check, cashier's check, or a bid bond, made payable to or in favor of the City of Costa Mesa, in an amount equal to at least ten percent (10%) of the total amount of the bid, to the Costa Mesa City Clerk PRIOR to the bid submission deadline. No bid will be considered unless such certified check, cashier's check, or bid bond is received by the City Clerk prior to the bid submission deadline. A valid California Contractor's State License C-15 (Flooring and Floor Covering License) issued by the California Contractors State License Board is required at the time the contract is awarded pursuant to California Public Contract Code section 3300. Each bidder must also be qualified as required by law at the time of the bid opening. A Payment Bond and a Performance Bond, each in the amount of 100% of the contract amount, will be required of the successful bidder prior to award of the contract. The City of Costa Mesa reserves the right, in its sole discretion, to reject any or all bids , or to waive any minor irregularities or informalities in any bid.

Bid Results

Fire / Police

$335,000.00

Public - City

Renovation

9

12

13

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
586
Active Projects
295
Bidding Soon
4,066
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2025

February 10, 2025

Project location map

99 Fair Dr, Costa Mesa, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.