Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 14, 2025 at 7:00 PM
Updated January 15, 2025
This is a service / maintenance or supply contract in Costa Mesa, California. Contact the soliciting agency for additional information.
Project Type RFP (Request for Proposal) Response Types Cost File Response File Type of Award Lump Sum Fire Station No. 2 was built in 1966 and is located at 800 Baker Street, Costa Mesa. The City of Costa Mesa is preparing to demolish the existing 6,600 SF station, construct a temporary living and operating quarters for the fire department on the same 0.79-acre lot, and construct a new LEED Gold 9,500 SF station. The project is currently under design with a construction groundbreaking anticipated in Fall of 2025. Pre-construction services are anticipated to begin in April of 2025. The construction phase has an anticipated duration of two-years and an estimated value of $12 Million. Exhibit A contains preliminary project plans. This RFP will include professional construction management services; working closely with City project staff for the duration of construction plus pre and post construction services; review of the construction documents prior to construction bid, constructability analysis, Prime Contractor prequalification; review and analysis of general contractor bid proposals and project schedules; construction oversight, coordination, inspection, specialty inspection, and materials testing; utility coordination, building commissioning, LEED enhanced commissioning, and, post occupancy services such as project close-out, claims resolution, and post inspections/job walks for the project and related site improvements. The objective of this RFP is for the City to identify and select a Construction Management firm (with a proven track record by both the firm and the individuals to be assigned to the project) to provide comprehensive construction management and project oversight services for this high-profile project. The selected firm and identified staff shall demonstrate strong construction knowledge and background in construction of municipal buildings and facilities; be capable of providing leadership to the entire design and construction team and be able to work in close partnership with City staff; and be able to oversee/manage/control documents, schedules, and costs during all phases of the project construction. Strong organization, documentation and communication skills are also a must to be considered for selection. Question Deadline 01/07/2025 at 11:00 AM PT Online Q&A Yes The City's goal is to have a proposal for the professional services needed to complete this project. If you feel that any items should be added to the scope of work to accomplish this goal, please include a separate description and cost item in your proposal. The City of Costa Mesa is requesting a proposal from your firm to provide professional construction management services, for the next several years, for the demolition of the existing station, establishment of a temporary station, and construction of a new LEED Gold station. The method of Contractor Selection has not been Determined at this time.
Conceptual
Fire / Police
$12,000,000.00
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2025
800 Baker St, Costa Mesa, CA
Related To This Project
Costa Mesa, CA
Bid Date: Jan 22 2025
Costa Mesa, CA
Bid Date: Feb 20 2025
Costa Mesa, CA
Bid Date: Feb 14 2025
Costa Mesa, CA
Bid Date: Mar 18 2025
Costa Mesa, CA
Bid Date: Feb 20 2025
Costa Mesa, CA
Bid Date: Feb 18 2025
Costa Mesa, CA
Bid Date: Mar 10 2025
Costa Mesa, CA
Bid Date: Jan 23 2025
Costa Mesa, CA
Bid Date: Dec 13 2024
Costa Mesa, CA
Bid Date: Jan 10 2025
Costa Mesa, CA
Bid Date: Jan 06 2025
Costa Mesa, CA
Bid Date: Dec 05 2024
Costa Mesa, CA
Bid Date: Nov 26 2024
Costa Mesa, CA
Bid Date: Nov 06 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
